InnerWeb
Skip to main content

Dead phone at the gate: what the gatekeeper does on the night shift

At two in the morning a temporary worker comes to the gatehouse whose phone has switched off, and the only QR code he has is on it. The gatekeeper has no supervisor at hand and must decide within a minute. We describe a scenario based on the functions of the security panel, without naming the plant.

86 × 54 mm
default size of the emergency label
Source: InnerWeb function documentation
12 h
threshold for automatic check-out of people on site
Source: InnerWeb function documentation

Situation: night shift, one person, no phone

This is a scenario for a production plant working three shifts, where security is alone at the gate. The temporary worker has passed the trainings and holds an invitation, is on the list of authorised persons, but his phone does not respond. The QR code exists only in one message on that phone.

The problem is not rare: the phone runs flat on the way, freezes in winter or falls into water. That is why the post instructions must describe the gatekeeper's decision before the first such case happens, not after it.

What the gatekeeper does not do

The gatekeeper does not dictate or read out the token to a person from outside the plant. The badge token is printed only on the physical label and is not returned in the responses of the security panel interface, so even if the gatekeeper wanted to give it, the system does not show it.

The gatekeeper also does not let anyone in on trust. The lack of a code does not mean the lack of an entry right, but the right must be confirmed in a way other than a code read by the scanner.

Gatekeeper decision time: night scenario (example calculation)

Gatekeeper decision time: night scenario (example calculation)With the instruction and a label, verification and granting access take 2 minutes each instead of 6 and 8.02468minVerificationWithout instruction (Verification): 6 min6With instruction and label (Verification): 2 min2Granting accessWithout instruction (Granting access): 8 min8With instruction and label (Granting access): 2 min2
  • Without instruction
  • With instruction and label
Source: Example calculation: times to be measured in the plant's trial

Emergency path step by step

The gatekeeper opens the security panel and searches for the person in the register. A guest registered at reception is created with first name, last name and phone only, and receives a printed label with a QR code in one action. The same action is available for a person who already has an account: the gatekeeper prints a new label.

When the person already has an issued code, it is safest to revoke it and issue a new one. Revocation does not overwrite the old entry: the system issues a new code and the old one stops working. If the phone with the previous code later reaches unauthorised hands, it will not open the gate.

  • Find the person in the panel and check whether they have valid trainings and an invitation.
  • Confirm identity with a photo ID or through the inviting person, as the plant's instruction requires.
  • Revoke the old code and issue a new one, printed on a label.
  • Scan the new label at the gate; a repeated scan within 5 seconds will not duplicate the entry.
  • Note the reason in the comments so that security sees the event in the morning.

A label instead of a phone: print parameters

The default label size with the code is 86 x 54 mm, and the code is not printed smaller than 13 mm. This matters for HID and USB-COM scanners, which read paper faster than a screen, and for the camera in the security panel. All these reading paths lead to the same recognition rule, so there is no difference in handling whether the code comes from a phone or from paper.

A label printer should be available at the gatehouse at night too, not only at the day reception. If the printer stands only there, the night gatekeeper cannot issue a label and falls back on the poorly documented practice of admitting people on the word of a supervisor.

After the event: order in the register

People present on the site for longer than 12 hours are automatically checked out every 3 hours, and such entries are marked as closed automatically. For the night shift this matters: a worker who entered on a paper label and left without a scan does not remain permanently on the list of people present.

In the morning the security manager should review the list of emergency events from the night. If there are several such events a week, it is worth asking temporary workers to test their phone before the first scan and to be reminded about charging.

Video

Frequently asked questions

Can the gatekeeper read the code from the panel?

No. The token is printed only on the physical label and is not returned in the interface responses.

What about the old code on the dead phone?

After revocation the old code stops working and the system issues a new one. The old entry is not overwritten, so the trace of the event remains.

Is the emergency label less secure?

No, it is the same type of code with the same 256-bit token, only on paper instead of on the phone.

Let us prepare instructions for the night gatekeeper

We will go through the phone failure scenarios with your security team and set up the label printer. Let's schedule a short call.

Let's talk