Why show the risks before the work
An external contractor knows their own technology, but not the hall. They do not know that forklifts operate next to the line, that dusty processes take place nearby, or where the entrance to a zone requiring special attention is. Location risks fill this gap before anyone picks up a tool.
In the system the worker sees the risks and the required protective measures before starting work, and on the printout in their own language, together with pictograms. The issuer does not prepare a separate instruction: it is enough to indicate the location correctly in the wizard.
Step by step in the wizard
Step four of the permit wizard shows the location risks in at most four subsections, according to the level of the hierarchy: hall, area, line and workstation. Empty levels are skipped, so the issuer does not scroll through empty lists. Below them the risks of high-risk work are grouped by subtype, and at the end are the risks added by the issuer.
The order of actions is simple. First you select the location, then the contractor company and the type of work, and in step four you review the risks. If something is missing, you add it in your own words or select it from the catalogue.
- Indicate the work location at the level of workstation, line or area
- Select the contractor and their workers
- Select the type and subtype of high-risk work
- In step four, review the location risk subsections
- Check the risks grouped by work subtype
- Add your own hazard if the situation requires it
What changes when you change the data during entry
Changing the contractor company in the wizard clears only the workers, the supervisor and the template, and the selected risks remain. Changing the location clears the additional locations and the template. The practical advice follows: changing the company need not be a concern, but after changing the location check whether the additional locations are still needed.
This matters when correcting permits prepared earlier. If the dispatcher moves the job to a neighbouring line, the list of location risks refreshes according to the new place, while risks previously added by the issuer remain as their own.
How to add your own hazard
Adding a risk in the context of a permit is available to every logged-in issuer. Assigning a new risk to a type or subtype of high-risk work, however, remains with the administrator and the safety role. The issuer therefore reports a situational hazard, and the safety team decides whether it becomes a permanent part of the catalogue.
On the printout the added risk goes to the fifth section and does not repeat what is shown above. If the risk proves to be recurring, it is worth asking the safety team to add it to the catalogue, so that subsequent permits do not need manual additions.
Proof for the auditor
The auditor wants to know one thing: whether the contractor was informed about the risks of the location before the work. A permit with risk sections in the worker's language and authorisation signatures is such proof, because it is issued before the work and contains everything in one document.
We do not promise compliance with a specific requirement: the system provides proof for the audit, and the decision on compliance rests with the plant and the auditor.
Video
Frequently asked questions
Do I have to show the risks manually?
No. Location and work type risks are assembled in step four of the wizard based on the selected location and work subtype.
What happens to the risks when I change the contractor?
Changing the company clears the workers, the supervisor and the template, but the selected risks remain.
Can every issuer add a risk?
Yes, in the context of a permit. Assigning a risk to a type or subtype of high-risk work is available to the administrator and the safety role.
Where do I find an added risk on the printout?
In the last section of risks added by the issuer. It does not repeat what is shown in sections one to four.