InnerWeb
Skip to main content

Recurring Service Visits: How to Schedule Up to 34 Days at Once

An external service team that returns every week or every day for several weeks should not have to wait at the gate for a security decision on each visit. The system lets you schedule visits for up to 34 days at once, each with a host. This guide for maintenance teams shows how to do it so that inspections do not end in a refusal.

34 days
maximum series of visits at once
Source: card
377 days
maximum lead time for planning
Source: card

What a Scheduled Visit Is For

A scheduled visit is the equivalent of a work permit for one day, without a time. At the gate it removes only the permit requirement. Training, qualifications and an active account still decide on entry, and in a food plant also the health statement for that day.

For maintenance, this has one practical consequence: the inspection calendar can be turned into visits, instead of creating a permit for every day. Without a visit, a technician from a scheduled inspection arrives at the gate and receives a refusal for lack of a permit or visit.

Planning Rules: Range of Days and the Host

A visit can be scheduled for days from today, up to 377 days ahead and up to 34 days at once. A day on which the person already has a visit is skipped, and the system does not overwrite someone else's host. If the plan covers a longer period than 34 days, it is split into consecutive series.

Every visit has a host, meaning an active internal employee of the plant. The coordinator of the external company does not schedule visits, because that would bypass the permit requirement. Visits are therefore scheduled by a plant employee: an administrator, a supervisor or an occupational health and safety officer. The Inviter role gives access to visit pre-registration without the rest of the system.

Visit planning limits in days

Visit planning limits in daysUp to thirty-four days in one series and up to three hundred and seventy-seven days of lead time.0100200300400daysSeries at once: 34 days34 daysSeries at onceLead time: 377 days377 daysLead time
Source: Scheduled visits function documentation

The 34-Day Plan Step by Step

Start with the service calendar: dates, people, scope of work. Then choose a host who is actually present at the plant on those days, because they will get the call from the dispatcher at the first entry of the guest. A host who is on holiday turns the plan into a series of unanswered calls.

Next, schedule the series: person, host, range of days. The system skips days on which the person already has a visit, so rescheduling does not create duplicates. Finally, check the visit list to confirm that every inspection day has an entry, and that the technicians have an active account, training and a health statement.

  • Collect dates and people from the inspection calendar.
  • Choose a host who is present at the plant on those days.
  • Schedule the series for up to 34 days; split a longer period into series.
  • Check that days with an existing visit were skipped, not overwritten.
  • Verify the technicians' accounts, training and health statements.

Pitfalls: What Still Causes a Refusal

A visit does not replace training or qualifications. The refusal codes follow a fixed order: account inactive, no health statement, missing training, missing qualifications, permit expired, no permit or visit. A visit removes only the last of these.

The second pitfall is a host with no phone number. On the first entry the dispatcher calls the host once, with no retries, and a host without a number receives one email asking them to complete the profile. Complete the hosts' data before the series starts.

The third pitfall concerns visits with no work to do, such as quotations or measurements. They are planned by an administrator, a supervisor or an occupational health and safety officer from the panel for external companies and guests, and on the day of arrival also by security from the refusal card at the gate, always for today.

Video

Frequently asked questions

Will a technician with a visit enter without training?

No. A visit removes only the permit requirement. Training, qualifications and an active account still decide on entry.

What if a person already has a visit on one of the days in the series?

The system skips that day and does not overwrite someone else's host.

Who can schedule a visit?

An employee of the plant with the appropriate role. The coordinator of an external company does not schedule visits, because that would bypass the permit requirement.

Plan inspections without refusals at the gate

We will show how to plan a series of service visits using a food plant as an example. Book a call or a demo.

Let's talk