How the Call to the Host Works
On a guest's first entry on the day of the visit, the dispatcher calls the host once, with no retries. Refusal and exit do not trigger the call. If the host has no number in their profile, they receive one email asking them to complete the profile.
The host is an active internal employee of the plant assigned to each planned visit. The call has one job: to tell the host that their guest is waiting at the gate, so they come out to collect them and the guest does not wander around the plant.
The Three-Minute Aggregation Rule
Further guests of the same host within 3 minutes of the last movement are collected into one group call. The call goes out after 30 seconds of quiet and contains at most 5 names. Three minutes without movement resets the window.
The five-name limit per group call matters for the calculation: twelve guests are not one call, but several group calls if everyone enters without a break. Below we count conservatively so that the savings are not overstated.
Number of dispatcher calls for 12 guests of one host
Example Calculation: Twelve Guests of One Host
Starting assumption: twelve guests of one host enter within 3 minutes. Without aggregation that is 12 calls, one per guest. With aggregation, a group call holds up to 5 names, so 12 people make 3 group calls (5 + 5 + 2), provided entries follow one another without a three-minute break.
We assume one minute of dispatcher work per call: choosing the host, connecting, passing on the information, a note. This is the calculation author's assumption, which the plant replaces with its own value. Without aggregation this comes to 12 minutes, with aggregation 3 minutes, so 9 minutes less for one arrival of a group.
The number of calls falls from 12 to 3, a reduction of 75%. In the best case, for one host and a smaller group of up to 5 people, the reduction is greater: five calls are replaced by one.
- Without aggregation: 12 calls and 12 minutes of dispatcher time.
- With aggregation: 3 group calls and 3 minutes of dispatcher time.
- Saving: 9 calls and 9 minutes for one arrival of 12 guests.
Annual Scale and Limits of the Calculation
If such a group arrives once a week, over a year (52 weeks) the saving is 52 times 9 minutes, that is 468 minutes, about 7.8 hours of dispatcher work. For arrivals once a month (12 times a year) it is 108 minutes, or 1.8 hours. These are example values, not a promise of an effect.
The real benefit is qualitative: the host receives one call instead of twelve, is not interrupted every few dozen seconds, and the dispatcher keeps a free line for events that cannot wait. The calculation does not include the cost of calls or the host's time, because these depend on the tariff and the plant's organisation.
Limit of the calculation: when guests enter at intervals longer than three minutes, the window resets and each call goes out separately. Aggregation helps with group arrivals, not with evenly spread traffic.
Dispatcher hours per year with a weekly group arrival
Example Calculation: Group Phone Call to the Host
| Parameter | Value |
|---|---|
| Guests of one host within a 3-minute window | 12 people |
| Maximum number of names in a group call | 5 names |
| Dispatcher time per call | 1 minute |
| Arrivals of such a group per year | 52 times |
Result: 12 calls instead of 3, which means 9 minutes less per arrival and about 7.8 hours a year.
Note: Example calculation on the author's assumptions. The plant replaces the call time and the frequency of arrivals with its own data.
Video
Frequently asked questions
Does the dispatcher call again if the host does not answer?
No. The call goes out once, with no retries, so the plant sets its own procedure for when there is no answer.
What if the host has no number in their profile?
The host receives one email asking them to complete the profile. It is worth filling in the data before go-live.
Does a refusal trigger the call?
No. Refusal and exit do not trigger the call to the host.
Calculate it for your plant
We will enter the number of guests and hosts from your plant into the calculation. Book a call or a demo.
Let's talk