InnerWeb
Skip to main content

Lone worker report: batteries, alarms and response time

The lone worker report shows whether the watches were ready for work, how many no-movement alarms there were and how quickly someone responded. This guide takes the security manager through each section: watch time on one charge, charging time, fall and warning alarms, SOS, response time and where alarms occur.

3
watch states on the daily chart: work, charging, no contact
Source: reporting feature card
3
values in the response time tile: min, average, max
Source: reporting feature card

Why the security manager needs a watch report

The lone worker system works only when the watch is charged, worn and visible in the system. The report answers whether this was the case and shows the events that required a response. It lets the security manager assess both the equipment and the organisational discipline.

The report is sent on a schedule by email, for example weekly, with a PDF attachment. Its data always covers a closed period, so it can be compared week to week.

Watch time on one charge

The first indicator is the watch running time on one charge. If the time is clearly shorter than the length of a shift, the worker is without monitoring in the second half of the shift, and the system may record this as a loss of contact.

A fall in running time over successive weeks may mean battery ageing, a change in how the device is used or the use of additional functions. It is a signal to check specific devices before a failure happens during a shift.

Indicators of the lone worker report

Indicators of the lone worker reportBar chart of item counts in four groups of the report: batteries, alarms, response time and alarm location0123number of itemsBatteries and charging(running time, required andactual charging time)Batteries and charging (running time, required and actual charging time): 3 number of items3Alarms (falls, warnings, SOS)Alarms (falls, warnings, SOS): 3 number of items3Response time (min, average,max)Response time (min, average, max): 3 number of items3Alarm location (sentence andranking)Alarm location (sentence and ranking): 2 number of items2
Source: Reporting feature card: content of the lone worker report

Charging time: required and actual

The report gives the required and the actual charging time. The required time is how long the watch must spend on the charger to last a shift. The actual time is how long it really spent there. If the actual time is shorter, the watch leaves with an incomplete battery.

A typical organisational problem: watches are put on the charger at the end of a shift for too short a time, because the next shift is already waiting. The remedy may be more chargers or a change in the watch replacement rhythm, and the report provides the figures for that decision.

No-movement and SOS alarms

The report divides no-movement alarms into falls and minor warnings. The division matters, because a fall requires an immediate response, while a warning about short inactivity often ends with the worker changing position. SOS calls, meaning a deliberate call for help, are counted separately.

A growing number of minor warnings at one post may suggest that the sensitivity does not match the nature of the work, for example in tasks that require long periods of stillness. In that case a conversation with the worker and a review of the settings is better than ignoring the signals.

  • Falls: immediate response, analysis of the cause after the event
  • Warnings: watch the trend at the post and talk to the worker
  • SOS: a separate category, always reviewed at the OHS meeting

Response time as one tile

The report shows response time as a single tile with minimum, average and maximum values. The minimum shows how quickly the system and people can respond in the best case, and the maximum shows how bad it can get. For assessing the process, the maximum is the most useful figure.

If the maximum is significantly above the average, it is worth checking when and where it occurred. A common cause is the night shift, when the dispatcher has fewer people, or a place that is hard to reach.

Where alarms occur and day by day

The report indicates the most common alarm location in a sentence and a ranking. Knowing that every third alarm comes from one hall changes the conversation: instead of a general reminder about the rules, the manager analyses a specific place.

The day-by-day chart shows three states for each watch: work, charging and no contact. It makes it easy to spot watches that often disappear from the system, and days when many devices lost contact at the same time, which may point to a problem with the infrastructure rather than with the workers.

Clean data and a plan for the next week

Service accounts and technical alarm templates are excluded from the report queries, so device tests do not inflate the figures. Times are given as values resistant to extremes.

After reading the report, write down three actions for the next week: devices to inspect, a post or hall to talk about, and a decision on chargers. A report without an action turns into a statistic.

Checklist

Video

Frequently asked questions

Why is response time given as min, average and max?

A single average hides extremes. Three values in one tile show both the best and the worst case.

Do device tests inflate the number of alarms?

No. Service accounts and technical alarm templates are excluded from the report queries.

Does the report show where alarms occur most often?

Yes. The most common alarm location is given in a sentence and a ranking.

See the lone worker report

We will show the battery, alarm and response time tiles using sample data. Book a demonstration with InnerWeb.

Let's talk