For whom and why: three cadences, three questions
Cadence answers the question of how quickly a recipient can act on something. The shift supervisor reacts within the day, the safety department plans the week, and management assesses trends over months. The same data set in three cadences therefore serves three different decisions.
A report rule has a daily, weekly or monthly cadence with a sending time. For the weekly cadence you choose a day of the week, and for the monthly cadence a day of the month from 1 to 28 or the last day. The range 1 to 28 follows from the varying length of months: day 29, 30 or 31 does not exist in every month, so the last day option is used instead.
Recommendation 1: a full, closed period as the rule
A report always covers a full, closed period. The daily report covers the previous day, the weekly report the previous full week from Monday to Sunday, and the monthly report the previous calendar month. That is why a Monday report does not show the current, unfinished week.
The reason is practical. Figures from an open period change as data arrives, so two people looking at the same report at different times could see different values. A full closed period gives a document that you can return to after a month and see the same numbers.
Number of days covered by one report in each cadence
Recommendation 2: a daily report for the shift supervisor, but in moderation
The daily report covers the previous day and best suits functions that require quick reaction: work permits, reports, alarms. Sending it in the morning, before the shift starts, lets the supervisor begin the day with a list of matters from the previous one.
Keep in mind, however, that with a daily cadence the issuers table for permits is a ranking, not a breakdown by day. This is good for a quick review, less so for analysing workload. If the shift supervisor receives several reports a day, some will stop being read, so limit daily rules to those that require action.
Recommendation 3: safety department and director, weekly report
The weekly report is a good compromise between speed and stability. It covers the previous full week, so it includes a full work cycle of shifts and the weekend. In the permit report, the issuers table shows each issuer broken down by day of the week, which makes uneven workloads visible.
Choose the sending day to match your meeting rhythm. If plant coordination takes place on Monday morning, the report should go out earlier that day, so that everyone has time to read it.
Recommendation 4: group and management, monthly report
The monthly report covers the previous calendar month and serves management best: trends, comparisons, a ranking of external contractors. In the permit report, the issuers table splits the data into the weeks of the month, so management sees whether the end of the month is loaded differently from the beginning.
Set the sending day to the first or a following day after the month closes, but remember that the day of the month is chosen from 1 to 28 or the last day option. When sending on the last day of the month, the report still covers the previous month, not the current one, which is worth explaining to recipients at the start.
Recommendation 5: several rules side by side, one owner for each
You do not have to choose a single cadence for the whole company. Rules are set per instance and per location scope, so two rules with different cadences, locations and recipients can run side by side. A typical setup: daily for hall supervisors, weekly for safety, monthly for management.
Assign each rule an owner who is responsible for keeping it current: recipients, cadence and scope. Rules without an owner, after a few months, send reports to people who have changed positions, or to nobody.
Video
Frequently asked questions
Why does the monthly report day end at 28?
Days 29, 30 and 31 do not exist in every month. That is why you choose a day from 1 to 28 or the last day option.
Does the weekly report cover the current week?
No. It covers the previous full week from Monday to Sunday, so it is closed at the moment of sending.
Can I have several rules with different cadences?
Yes. Rules run side by side as long as they differ in location scope or recipients, or have a different cadence and recipients.
Let us match report cadences to your roles
We will go through shift supervisors, the safety department and management with you, and set the cadences, sending times and scope. Book a short demo.
Let's talk