Operating principle behind the sizing rule
A person's position is determined from the signals of several transmitters and averaged on the map. The system works without GPS, so it is suitable in buildings, halls and places where the satellite signal is weak. The denser the transmitters, the more stable the position, but density makes sense only up to a limit.
The InnerWeb industrial beacon has an industrial design registration, a CE declaration and an ATEX construction for zones 2/22. In a partner project one device family usually suffices, but explosion-hazard zones require a separate description and the choice of an appropriate construction.
Rules: buildings and plant roads
In a building we assume 1 transmitter per 100-200 m². The lower value, 100 m², applies where greater accuracy is needed or where the interior is crowded with racks and machines. The upper value, 200 m², is sufficient in open spaces and halls with a simple layout.
On plant roads transmitters are placed about every 100 m. One transmitter must be added to the number of segments to cover both ends of the route.
Quoting formulas
Hall: floor area in m² divided by 200 gives the minimum value, and divided by 100 the maximum value. Road: length in metres divided by 100, plus 1.
Number of transmitters in an example plant: minimum and maximum
- Minimum (1 per 200 m²)
- Maximum (1 per 100 m²)
Worked example
The example plant has a production hall of 6,000 m², a warehouse of 12,000 m² and roads with a total length of 1,800 m. For the hall this gives 30 to 60 transmitters, for the warehouse 60 to 120, and for the roads 19 (1,800 divided by 100, plus 1).
In total this gives 109 to 199 transmitters. The partner should adopt a value depending on the layout: denser for a hall with machines, sparser for an open warehouse. The final value is confirmed by a site survey and a test on a trial area.
Converting to a subscription cost
BLE transmitters cost 700 PLN net per month per 100 pieces on subscription. For 109 pieces the partner rounds up to two packs of 100, that is 1,400 PLN net per month, and for 199 pieces also to two packs. These are indicative ranges from 2025-2026 implementations; individual pricing applies.
It is worth stating in the offer whether the partner allows a reserve for future expansion, and agreeing with the customer who is responsible for mounting transmitters at height and in areas with restricted access.
How to present the sizing to the customer
The customer, especially procurement and IT, expects a justification of the number of devices. The partner should show a plant plan with marked areas, the density adopted for each of them, and the total broken down into hall, warehouse and roads. Such a layout makes the assumptions easy to verify and to correct after a site survey.
A good practice is to show two variants: minimum and recommended, with the difference in the subscription. The customer decides for itself whether a given area needs greater accuracy, for example for lone workers or for vehicle traffic.
Errors in sizing
The most common error is counting by the number of employees instead of floor area. The second is omitting roads, parking areas and yards, which in a plant are places of accidents and vehicle traffic. The third is applying one value to the whole plant without accounting for the difference between a hall with machines and an open warehouse.
The fourth error is the lack of a trial on a test area. A few transmitters placed according to the rule and a short drive with measurements allow the assumptions to be verified before the customer accepts the full design.
Video
Frequently asked questions
Does the system need GPS?
No. The position is calculated from the signals of several transmitters and averaged on the map, so the system works in buildings and in areas with a limited satellite signal.
Does the number of transmitters depend on the number of employees?
No. It depends on the floor area of buildings and the length of roads. The number of people affects the number of licences, not the amount of equipment.
Is the industrial beacon suitable for Ex zones?
The industrial beacon has an ATEX construction for zones 2/22. Other zones require a separate analysis and the choice of a construction.
Let's count the equipment for your project
Give us the floor areas of the halls, the length of the roads and the plant layout. We will help select the number of beacons and prepare a quote.
Let's talk