InnerWeb
Skip to main content

Guest registration cost: reception desk vs kiosk at a packaging plant

Registering a guest at the counter takes reception and security minutes, and those minutes multiply with every visit. We show a sample calculation for a plant with several dozen guests a week: how much time is recovered when the label is printed in advance and the health declaration and induction training run unattended at a kiosk.

-70%
reception and security time per guest (10 to 3 minutes)
Source: example calculation
280 min
weekly saving with 40 guests
Source: example calculation

What the guest registration time consists of

A guest arrives at the plant without an account, without a badge and without induction training. In the traditional model reception enters the data, explains the rules, waits for the printout, and security separately collects the health declaration. Each of these steps takes the time of a person who could be doing something else.

In InnerWeb, reception turns the guest's first and last name into an external account with a registry number and a printed QR badge in one action. When the label is ready earlier, this action disappears from the queue at the counter.

  • entering the guest's data and creating the account
  • printing the QR code badge
  • safety briefing and induction training
  • health declaration required by the BRC standard
  • issuing and collecting the badge at exit

Two mechanisms that shorten the time

The first is the Print QR code list: the secretariat sees people who created an account and are in training, but never had a label printed. The badge is therefore ready before the guest reaches reception. A person disappears from the list after printing.

The second is the registration kiosk, an unattended station where the only input device is a USB scanner. It welcomes a trained person, while an untrained one is taken through the induction training, including a whole group at once. The health declaration can be filed in the same pass.

Reception and security minutes a week (40 guests)

Reception and security minutes a week (40 guests)Before and after chart: 400 minutes a week in the traditional model, 120 minutes with a label printed in advance and a kiosk.0100200300400minTraditional model: 400 min400 minTraditional modelLabel in advance and kiosk: 120 min120 minLabel in advance and kiosk
Source: Sample calculation on the assumptions from the Calculation section

Cost structure

The cost of guest registration consists of the working time of people at the counter, the cost of materials (labels, DYMO printer, USB scanner) and the cost of errors, for example a guest admitted without a declaration. InnerWeb implementation prices depend on scope: we quote the implementation price after a conversation about scope (indicative ranges from 2025-2026 implementations; individual quotation).

The largest item is human labour, which is why the calculation below counts minutes only.

Sample calculation on assumptions

The calculation is a sample and rests on assumptions that a plant can replace with its own measurements. It does not describe any specific plant.

With 40 guests a week and 10 minutes of reception and security time per guest in the traditional model, that is 400 minutes a week, cutting it to 3 minutes per guest (gate check, badge ready) gives 120 minutes. The saving is 280 minutes a week, about 4.7 hours; over a year (48 weeks) about 224 hours of work.

How to calculate it for your own plant

Measure for one week the average time at the counter from greeting the guest to handing over the badge. Multiply by the number of guests a week. From the result subtract the time that remains at the gate anyway: the QR code check and any verbal confirmation of the declaration. The difference is your saving.

What the calculation does not cover

The calculation does not price the audit risk. A guest admitted without a health declaration is a non-conformity whose cost is hard to average. In the system the declaration is a condition of entry, so this scenario does not appear in the register. We also do not price the value of faster entry for the guest, although it matters for relations with suppliers and customers.

How to measure registration time before the decision

Before a plant accepts any calculation, it is worth collecting a simple set of measurements over two weeks. The receptionist or guard records three times: from greeting the guest to creating the account, from creating the account to handing over the badge, and from handing over the badge to passing the gate. Separately, we note how many guests arrived pre-booked and how many without notice.

Such a measurement has two advantages. First, it shows which part of the time is taken by typing data and printing, that is, by the steps that a label printed in advance removes from the counter. Second, it gives management a figure from its own plant instead of an example from someone else's assumptions.

If most guests arrive without notice, the saving will be smaller, but the kiosk still shortens the time, because induction training and the declaration run without an employee. If most are announced, the Print QR code list gains the most.

Example calculation

Time saving in guest registration

Assumptions
ParameterValue
Guests a week40 people
Time per guest, traditional model10 min
Time per guest, label in advance and kiosk3 min
Working weeks in a year48 wk.

Result: 280 minutes a week, about 224 hours a year

Note: Sample calculation on assumptions that the plant replaces with its own measurements; it does not describe a specific plant.

Video

Frequently asked questions

Does the kiosk need staff?

No. It is an unattended station where the only input device is a USB scanner. A trained person is welcomed, and an untrained one is taken through the induction training.

Where do I get my own figures for the calculation?

From a short measurement of time at the counter over one week and from the number of invitations in the system. An average is enough; there is no need to measure every guest.

Must the guest have an account before the visit?

No. The guest arrives without an account, and reception or registration from a QR code turns their data into an external account with a registry number.

Let's calculate registration time at your plant

Together we will measure the time at the counter and prepare a calculation on your figures, before you decide on a kiosk.

Let's talk