InnerWeb
Skip to main content

Gate registration station: good practices

The registration station is a kiosk at the gate whose only input device is a USB scanner. It works without supervision, so it must handle traffic from drivers, couriers and training groups. We describe the setup, access protection and the scenarios worth testing before go-live.

168 bits
length of the kiosk access token (42 hexadecimal characters)
4
training languages in kiosk mode

What the station does and what it does not do

The registration station is an unattended kiosk whose only input device is a USB scanner. It welcomes a trained person and plays the induction training for an untrained one, including a whole group at once. As a result, the guard does not have to deliver a briefing to every driver.

A visitor arrives at the plant without an account, without a badge and without induction training. Reception turns the visitor's name into an external account with a registration number and a printed QR badge in one step, and the kiosk at the gate then handles visitors who already have a badge.

The station works independently of the plant's access control system. It does not replace readers or change existing gates: the USB scanner reads the QR code on the badge, and card punches remain in the access control system.

Securing access to the kiosk

The registration station address carries an access token of 42 hexadecimal characters, that is 168 bits. The administrator can rotate it, and an empty token means closed, not open, endpoints. This is an important rule: a configuration error does not open the station to everyone.

Rotating the token invalidates the old address, so after a change the address must be updated in the kiosk browser. It is worth planning rotation after a change of security staff or after losing a device, not only at fixed intervals.

The token in the address is access to the station, but it is not proof of the visitor's identity. The visitor still confirms themselves with a badge or card, and the statement in training requires a token from the invitation or an active badge.

Kiosk access token

Kiosk access tokenBar chart: the kiosk access token has 42 hexadecimal characters, that is 168 bits.050100150200countHexadecimal characters: 42 count42 countHexadecimal charactersBits: 168 count168 countBits
Source: InnerWeb

Equipment and traffic layout

The USB scanner should be mounted permanently, at a height reachable from a driver's cab or from a standing person, with a rain cover. Truck drivers register from the cab window, so the kiosk stands on the entrance side, not at the pedestrian gate.

A training group needs a place where several people can see the screen. The training is played to the whole group at once, so it is worth ensuring the volume and screen legibility under plant noise.

  • USB scanner mounted permanently and protected from rain.
  • Kiosk on the entrance side for drivers, with a separate pedestrian gate.
  • Screen visible to the whole group and audible over the noise.
  • Power and connectivity checked in the worst weather.
  • Spare scanner on site or with security.

Languages and the path for visitors without training

The language chosen at registration from the QR poster or on the tablet at the gate is the account language and decides the training language. When training in that language is missing, the gate requires training in Polish instead of skipping it. For foreign drivers it is therefore worth completing the language most of them use.

The training system in kiosk mode supports Polish, English, Ukrainian and Russian. The material is PDF slides or a video, followed by a multiple-choice test.

Acceptance test without supervision

The station is meant to work unattended, so the acceptance test should simulate that absence. Five scenarios are enough: a visitor with a badge and training, a visitor without training, a group without training, a person with a blocked account, and an attempt to enter with the old address after a token rotation. The expected results are welcome, training, group training, refusal and no access, respectively.

It is worth attaching the test record to the implementation documentation, because an auditor may ask how the plant checked the station before go-live.

Checklist

Video

Frequently asked questions

Does the kiosk need a keyboard?

No. The only input device is a USB scanner that reads the QR code on the badge.

What does an empty token mean?

Closed endpoints. An empty token does not open the station to everyone.

Can the kiosk handle a whole group at once?

Yes. It plays the induction training to an untrained person or to a whole group at once.

Let's talk about the gate station

We will show the USB scanner kiosk in the conditions of a production plant. Book a conversation with the InnerWeb team.

Let's talk