Transmitter identifier inventory: good practices

The transmitter identifier register is the only place where you can see whether two devices have received the same major and minor pair. Below are the practices for keeping a register of pairs and positions, so that a technician after installation does not introduce a duplicate.

Why the register matters more than the transmitters themselves

Each beacon has an identifier made of a major and minor pair, and the system assigns this identifier to one place on the map. Two physical transmitters with the same identifier, hung in distant places, are indistinguishable for the system and show up as route jumps. It is easier to prevent this than to fix it.

The register is therefore a quality control of the installation. It should answer two questions: does every major and minor pair occur exactly once, and does the recorded position match the place where the transmitter hangs.

Practice 1: one pair, one place, one entry

In the register, each row describes one physical transmitter: the major and minor identifier, the hall or road, the coordinates and the installation date. A major and minor pair must not repeat in another row. Add a uniqueness check to the spreadsheet or to the application in which the technician closes the installation order.

Before closing the order, the technician checks in the register whether the identifier is already taken. If it is, the transmitter goes back to the warehouse and receives a new identifier, instead of being hung with a duplicate.

Sample register: transmitters in a hall by area

Sample register: transmitters in a hall by areaBar chart of the number of transmitter register rows for halls of 2,000, 5,000 and 10,000 square metres.020406080pcs2,000 m2: 13 pcs13 pcs2,000 m25,000 m2: 33 pcs33 pcs5,000 m210,000 m2: 67 pcs67 pcs10,000 m2
Source: Sample calculation: midpoint of the range of 1 transmitter per 100 to 200 m2, rounded up

Practice 2: record positions in the same units as the system

The transmitter position is recorded in centimetres as x, y, z coordinates, and the map displays them after conversion to metres. If a technician enters metres as centimetres, the transmitter lands on the map at a place an order of magnitude away. Unify the unit on the installation card and label the fields, for example x in cm, y in cm, z in cm.

Add the mounting height and a description of the reference point to the register, for example a pole at gate no. 3. This way, even after a change in the layout of the hall, it is possible to establish where the transmitter actually hangs.

Practice 3: changes only through the admin application

Transmitter edits made in the admin application go to the audit log, while changes made outside the application bypass it. In practice this means a ban on correcting data directly in the database, even when it is faster. If someone changes a position or identifier outside the application, nobody can later establish who, when and why did it.

It is good to add a short reason for the change to the service note alongside the audit log entry, because the information that an edit was made does not say why it was made.

Practice 4: verification after installation on the control route

After installing a batch of transmitters, walk or drive the control route with the device and review the result on the map. A route jump or a point outside the road corridor is a sign that some transmitter is recorded in the wrong place or is duplicated. An effective diagnosis is to compare the point with the previous and next points of the same tracker.

Recorded route points are immutable snapshots taken at the time of reading, so errors made during installation remain in the history. The sooner you catch them, the fewer data points will need to be marked as affected by the error.

Practice 5: periodic review and layout changes

Once a quarter, compare the register with reality on a selected section of the plant. Especially after a rebuild of the hall, moving racking or installing new structures that may require relocating transmitters. After every change, update the register and the map within the same order, so that no gap arises between the actual state and the record.

The register is only useful if someone owns it. Name a person in maintenance who approves every new entry, and set the rule that a transmitter without a register entry does not hang in the plant. A simple rule that an installation without an entry is not finished prevents duplicates more effectively than later searching for errors on the map.

Checklist

Video

Frequently asked questions

What is a major and minor pair?

It is the two-part identifier of a BLE transmitter. The system assigns the pair to one place on the map, so it should not occur twice in the same system.

How quickly can a duplicate be detected?

Through the uniqueness check in the register and through the control route after installation: a route jump points to a transmitter recorded in the wrong place.

Can the position be corrected without the application?

Technically yes, but such a change bypasses the audit log. That is why all edits are made in the admin application.

How often should the register be reviewed?

Once a quarter and after every change to the layout of the hall, moving of racking or major rebuilding.