Start with the list of places the group will not see
It is best to lay out the tour route from the end: first the list of zones closed to guests, then what remains. In a manufacturing plant the list usually includes the paint shop, the chemicals store, zones with hot work, areas with forklift traffic and places where special clothing or authorisation is required.
The list is an OHS document, not a timetable. The OHS manager is responsible for making sure the group supervisor has it in front of them, not only in memory.
Practice 1: mark the zones on the map
The isometric map of the hall with the transmitters and the risks assigned to locations makes it possible to show the group supervisor which places on the site are closed to guests. We describe this as a scenario, not an implementation. The benefit is practical: the supervisor does not have to remember a verbal description, because they see the zone on the plan.
When laying out the route, check whether the risk assigned to a location matches what actually happens there on the day of the visit. A zone that is an ordinary corridor on Monday may be a place of hot work on Tuesday.
Number of calls to supervisors for 20 guests (example)
Practice 2: combine the route with the training
The introductory training at the workstation is the moment when guests learn where they may not enter. The training film is played once for the whole group at the same time, and the language selected at the desk determines the version of the film. For a group with foreign visitors the route and the prohibitions must be described in their language, otherwise the prohibition exists only on paper.
After the training the supervisor repeats the rules at the entrance to the hall in their own words. The repetition takes a minute and does more than another sign on the wall.
Practice 3: make the group smaller, increase supervision
A supervisor who has been assigned 20 people cannot keep an eye on all of them at once. Splitting the tour into two groups of 10 people with two supervisors requires more people, but it limits the risk of the group straying off the route. Each group then has its own supervisor, its own entry on the list and its own phone, which rings at the first entry of a guest.
The system collects further guests of the same supervisor within 3 minutes, and after 30 seconds of silence one group call rings with the names of up to 5 people. Two smaller teams mean two smaller sets of calls.
Practice 4: prepare a contingency route
The route may change on the day of the visit, because work in a restricted zone runs longer or a forklift blocks the passage. Prepare a shortened variant that bypasses the same section. The supervisor should know when to switch to the contingency variant and whom to inform.
If an alarm goes off during the tour, security uses the evacuation list, which divides people into six groups in a fixed order, with guests first. A tour route shared with the evacuation plan shortens the time needed to leave the site.
Practice 5: the health declaration as a gate before the route
When the plant has switched on the health declaration, a person without today's declaration does not enter. This check happens at the gate, before the route, so the OHS manager does not need to repeat it. It is still worth asking HR whether the same requirement applies to groups, because the function is switched off by default and the plant switches it on separately.
Checklist
Video
Frequently asked questions
Will the system stop a group from entering a restricted zone by itself?
We describe this as a scenario with a map and the risks assigned to locations, which shows the supervisor the closed places. Physical blocking of entry is provided by the plant's access control system.
Who lays out the route?
The OHS manager together with the group supervisor. The route is an OHS document with the list of restricted zones, not only a tour timetable.
What if the route changes on the day of the visit?
The supervisor switches to the contingency variant prepared in advance and informs security. The evacuation list still shows who is on the site.
Planning a route for groups?
We will show you a hall map with restricted zones and the risks assigned to locations. Talk to your OHS manager with us.
Let's talk