Who is on the evacuation list during a group visit?
The evacuation list answers one question during an alarm: who is physically on site. It is built from QR scans at the gate and refreshes every 13 seconds. Members of a visitor group are on it from the moment of the scan, not from the moment the supervisor reads out their names.
People are split into six groups in a fixed order: guests, couriers, suppliers, plant employees, external companies with a tab for each company, and uncertain. The fixed order matters during an evacuation: the assembly point coordinator knows that guests are on the first page, not somewhere in the middle of the list.
Is a group that is still in training visible?
Yes. A person who scanned in at the training station goes onto the evacuation list from the moment of the scan, with the status training in progress. This also applies when something other than the training is missing, for example a declaration or a qualification.
For security this is a fundamental difference compared with a paper register, where an entry appears only after all formalities are finished. A group of students watching a safety video is already on site, so it must be on the list.
Time windows of the evacuation list
What happens when the list refresh fails?
The evacuation list prefers to show too many people rather than too few. A person missing from the list during a fire is someone nobody searches for, so uncertain entries go to a separate tab with a stated reason. The rule also applies when the data is incomplete.
The printout carries a permanent note about the data source. It repeats on every page, so that the person holding a single sheet at the assembly point knows what the list is based on and how often it was refreshed.
What does the printout look like for the assembly point coordinator?
The evacuation printout has one page per group. The header and the data source note repeat on every page. The assembly point coordinator for guests therefore gets a separate sheet with the guests, and the external companies assembly point gets its own.
When does a person move to the Uncertain tab?
An entry without an exit scan closes automatically after 12 hours. The Uncertain tab window is 24 hours by default. This means that a person who entered in the morning and did not scan the exit is treated as present for the first few hours, and later moves to the category that needs checking.
In practice the Uncertain tab is a phone list: the group supervisor confirms who left without a scan. Security does not guess, it checks specific names with the reason recorded for each entry.
- an entry without an exit closes after 12 hours
- the Uncertain tab window is 24 hours by default
- every uncertain entry has a stated reason
- after checking, the entry can be agreed with the group supervisor
Does the list show which zones the group is in?
The evacuation list answers the question who is on site, not exactly where they stand. If the plant wants to show the supervisor which places are closed to guests, this can be described on an isometric map of the hall with beacons and risks assigned to locations. We describe this as a scenario for a production-type plant, not as a finished deployment.
For an ordinary tour the rule is simple: the group moves along the route with the supervisor, and the list at the gate is the basis for security.
Video
Frequently asked questions
Does security have to rewrite guest names by hand?
No. The list is built from QR scans at the gate, so security receives it ready and refreshed every 13 seconds.
Does the printout work without access to the system?
The printout is a sheet with one page per group and a note on the data source. It should be prepared in advance according to the plant's procedure, and during an alarm it is used to tick off people at the assembly point.
Why do uncertain people not disappear from the list?
Because a person missing from the list during a fire is someone nobody searches for. The system shows them separately, with a reason, so that every entry can be verified.
Do external companies get separate sheets?
Yes. External companies have a tab for each company, and the printout contains one page per group.
Want to see the evacuation list with a guest group?
We will show how security sees groups, uncertain entries and the assembly point printout. Book a demo with the head of security.
Let's talk