Why rules matter as much as technology
A 125 kHz card transmits a fixed number without authentication, and the number can be written onto a blank card in a few seconds. A DESFire card with AES encryption resists such copying, but any card can be lost, lent or left in a jacket. That is why the rules for handling a card carry as much weight as its technology.
The good practices below work with any card technology. For 125 kHz cards they additionally compensate for a weakness that cannot be removed without replacement.
Lost card: the first hours
An employee should know whom to report to and how before a card is lost. The best approach is a single reporting channel open around the clock, for example the gatehouse or the security duty desk, not a form available only during office hours.
After the report, the card is blocked in the system and the employee receives a replacement card with a new number. The old number stays on the blocked list, so any attempt to use it is recorded. The event is saved in the security report.
What to record when reporting
The date and time of the report, the last place where the employee saw the card, and whether the card was carried together with other documents. These details help when the card later appears in the log after it was blocked.
Sample time from reporting a lost card to blocking
Blocking and the replacement card
Blocking is done by a person authorized in the KD system, not by any security guard. Separating these permissions reduces the risk that a card is blocked by mistake or abused.
In the authorization and training system the employee's account stays the same; only the card assigned to the account changes. Qualifications, training and authorizations therefore do not need to be entered again.
Review of account lists with cards
Once a month, security reviews the list of active accounts with an assigned card. It looks for cards assigned to people who have left, changed companies or have not entered the plant for a long time. Such cards should be blocked.
In the InnerWeb training module, the search for accounts with a card returns at most 13 results, only active accounts with an assigned card, and does not reveal the card number. The system never links or redirects an active account based only on a similar surname, so the review does not risk mixing up two people with similar surnames.
Behavior of employees at the gate
Employees do not pass their card to a colleague, do not hold the door for a stranger and do not leave the card in view in the locker room. This rule is worth repeating in initial and periodic training, together with a short explanation of why a 125 kHz card can be copied without the owner's knowledge.
Security reacts to situations in which two people enter on one swipe. Recording the event and an explanatory conversation are enough in most plants, but repeated cases go to the head of security.
The role of training and communication with staff
Rules for handling a card work when the employee understands their reason. In initial and periodic training five minutes is enough: what a card is, why its number can be copied in seconds, whom to report a loss to and how a card replacement works. A short message is more effective than a long instruction.
Informing staff about consequences is also good practice: a lost card that is not reported works like a key to the gate. In the InnerWeb training module, an employee's account can be selected by a card swipe, and in an emergency by selecting the company and typing at least 3 characters of the first or last name, so a lost card does not block training.
Checklist
Video
Frequently asked questions
How quickly after a report should the card be blocked?
As quickly as possible, ideally within an hour of the report. A lost 125 kHz card works like an unprotected key, so every hour increases the risk.
Does a replacement card require new training?
No, if the employee's account stays the same and only the assigned card changes. Qualifications and training are linked to the account, not to the card number.
Does the system reveal the card number when searching for an account?
No. The card account search does not reveal the card number and shows only active accounts with an assigned card.
Sources
Tidy up accounts with cards in your plant
We will show how the card account search and authorization rules work together in the InnerWeb system. Book a call.
Let's talk