What we know about a watch running on battery
The LoRa watch does not connect to Wi-Fi. A gateway translates its radio frames into the existing HTTP contract of the backend, and the watch itself stays in deep sleep between pulses. That is why it works for days, not hours. This is a fundamental difference from devices that must be charged every shift.
The watch periodically sends a pulse with information about the transmitters it hears, signal strength, battery level and status. The battery level is therefore visible on the platform and can be checked remotely, without calling the worker.
Pulse period and the load on radio and battery
The LoRa watch operates in the 869.4-869.65 MHz band with 500 mW ERP and a 10% transmit duty cycle limit. With a 120 s pulse period, the use of airtime is about 0.2%. The period is set in the panel: default 120 s, range 30-3600 s, and the change reaches the watches in response to the next pulse, without reflashing the fleet.
From these values one can calculate how the period affects channel occupancy. Assuming about 0.24 s of transmission per pulse (0.2% of 120 s), at a 30 s period usage is about 0.8%, at 600 s about 0.04% and at 3600 s about 0.007%. This is a calculation from the given parameters, not a measurement. A shorter period gives more frequent position readings and faster reaction, but it wakes the radio more often and so usually shortens battery life. Use it where the risk requires it.
Airtime use at different pulse periods
Practice 1: charging in a fixed place and at a fixed time
Set a place for putting the watch down, preferably at the crew base or in the vehicle, and link charging to an activity that is already routine, for example handing over the car keys after the shift. Routine is more reliable than memory. Since the watch works for days, the charging cycle can be matched to the crew rotation, not to a single shift.
Practice 2: spare watch in the vehicle
Each vehicle or each crew has at least one charged spare watch. If an employee notices a discharged watch already at the site, he swaps it for the spare, and the coordinator assigns the device to his person in the system. The spare must not stay in the office: it has to travel with the crew.
Practice 3: battery monitoring from the platform
Because every pulse carries the battery level, the coordinator reviews the list of devices with the lowest charge and asks for a swap before the watch goes dark. Instead of asking employees whether they remembered to charge, the coordinator sees the data. Set a threshold at which the watch must be charged at the nearest base, and apply it the same way to all crews.
Practice 4: do not burden the employee with battery responsibility
Continuity of protection is the organization's task. The employee should know how to swap the watch for the spare and whom to report a problem to, but should not be the only link in the control. If protection depends on a person's memory, at some point it will stop working. The duty to ensure safe working conditions results from Article 207 of the Labour Code, and the system provides evidence for an audit, not a guarantee of compliance.
Checklist
Video
Frequently asked questions
How often must a LoRa watch be charged?
The watch works for days, not hours, because it is in deep sleep between pulses. The exact time depends on the pulse period, which is set in the panel.
Does changing the pulse period require visiting the devices?
No. The period reaches the watches in response to the next pulse, without reflashing the fleet.
How does the coordinator know the battery is low?
Every pulse carries the battery level, so it is visible on the platform without asking the employee.
Sources
Plan charging and spares for your crews
We will walk you through the pulse period, the spare watch supply and battery monitoring for a chosen mobile crew.
Let's talk