Why hall data is the foundation of the demo
The board recognizes its hall by its shape and position, not by icons. If the plan is rotated by a few degrees or a building shape sticks out beyond the fence, the credibility of the demo drops within the first minute, regardless of how good the functions are.
The demo runs on a demonstration instance with its own area, locations and transmitters marked with an external identifier. The plant data consists of the georeferencing of the hall, the building shapes and the locations with transmitter numbers.
Practice 1: georeferencing, meaning a point and an angle
Georeferencing of the hall is a reference point and the rotation angle of the plan relative to north. Without these two values the isometric map will not line up with the real site. It is worth approving them first, before you start entering the building shapes.
Check the angle on two characteristic corners of the hall: if both match the image of the site, the rotation is correct. An error of a few degrees becomes visible only with more distant buildings.
Sample schedule of work before the demo
Practice 2: building shapes
Building shapes should reflect the outline and an approximate height. The 2.5D map shows buildings, vehicles, employees and work locations, so the shapes form the background of all scenes.
An architectural model is not needed. For the demo, an outline from the plant layout is enough, and the height can be approximate, making sure the halls do not hide neighbouring locations.
Practice 3: locations with transmitter numbers
Every demo location should have a transmitter number. This is how the positions of employees are tied to a place. Mark the locations and transmitters with an external identifier, so that after the demo you can remove them without risk to other data.
Risks and protective measures are assigned to locations. If you assign risks to the assembly hall beforehand, a permit in that hall during the demo will immediately show the risks of the place, which works well for the plant director.
- a transmitter number at every demo location,
- an external identifier on locations and transmitters,
- risks and protective measures assigned to key locations,
- location names that are understandable to the board.
Practice 4: a database backup before changes
Before changing data on the demonstration instance, make a database backup: a gzip-compressed dump and a check of the file size. A size close to zero means the backup failed. Only after confirming it, enter the georeferencing and the locations.
Make the backup after every larger series of changes, not only once at the beginning. If you make a mistake, you will return to the last good state, not to the point from a week of work earlier.
Schedule for the week before the demo
Seven days are enough if the input data is available from the start. Spend the first and second day on georeferencing and building shapes, the third and fourth on locations, the fifth on risks, and the last days on trial runs of the whole scenario.
Run the scenario in full at least once: from the permit to the alarm. This is when gaps in attaching locations to templates surface, which are hard to fix live.
Checklist
Video
Frequently asked questions
What hall data is needed for the demo?
Georeferencing of the hall (reference point and rotation angle of the plan relative to north), building shapes and locations with transmitter numbers.
Is an architectural model required?
No. For the demo, the outline of the buildings from the plant layout with an approximate height is enough.
Why an external identifier?
It marks the locations and transmitters of the demo, so after it ends they can be removed without touching other data.
Hall data ready in a week
The InnerWeb team will prepare the georeferencing, shapes and locations for the demo on your plant's layouts.
Let's talk