InnerWeb
Skip to main content

Demo script: SOS, stillness and permits

A coherent demo scenario starts with a permit, moves to SOS and stillness, and ends with a visitor. This order leads the board from work planning through the hazard to the control of entry. Below are good practices and a checklist for the presenter.

7
steps of the permit wizard
3 s
SOS countdown with the option to cancel

Narrative rule: from work to hazard

The board remembers a story more easily than a list of functions. That is why the scenario is worth building around one employee: they receive a permit, go out to the hall, need help, and in the background a visitor arrives. Each scene follows from the previous one.

All scenes take place on the isometric map, which stays as the constant background. The presenter does not switch tabs, but adds successive events in the same place.

Scene 1: a permit with automatic approval

A permit is created in a seven-step wizard: basic data, dangerous work, tasks, risks, employees, notifications and a summary with a print preview. Risks assigned to the location appear automatically once the hall is selected.

For the demo, use a template with automatic approval. It gives the work an active status immediately, which shortens the scenario and saves minutes of waiting for approval.

If you approve a work from the pending list, do it by the permit identifier. The approval function can approve the oldest pending work in the whole system.

Sample duration of demo scenes

Sample duration of demo scenesHorizontal bar chart of scene durations: permit 6, SOS 4, stillness 4, visitor 5 minutes0246minPermitPermit: 6 min6SOSSOS: 4 min4StillnessStillness: 4 min4VisitorVisitor: 5 min5
Source: Sample calculation: scene durations proposed by the author

Scene 2: SOS from a watch

The SOS alarm starts with a triple click or a long press of the watch button, with a three-second countdown allowing cancellation. A marker appears on the map, and the siren plays if the template has sound playback enabled.

Remember to click the map after opening it, because browsers block sound without a user gesture. Do this before the demo starts, not during it.

Scene 3: stillness and a two-sided alarm

Stillness is detected two-sidedly: the application analyzes the device sensors, while the server independently measures the time. A full alarm is triggered only when both agree. After the threshold is exceeded, the system sends notifications, creates an alarm permit from the ALARM template and marks the alarm on the map.

Before the scene, make sure the location is attached to the ALARM template. Otherwise the alarm exists only in the cache and does not appear on the map.

Scene 4: a visitor at the kiosk and a QR badge

To finish, show the visitor registration at the kiosk with the QR code from the invitation and the QR badge printed at reception. Both elements can be shown at one station, which shortens the preparation.

The visitor's health declaration is a function disabled by default. If the demo is to include it, enable it beforehand and tell the board that once enabled, a visitor without today's declaration does not enter, and the entry is not recorded.

Checklist

Video

Frequently asked questions

Which scene should come first?

The permit, because it introduces the hero and the place where the hazard appears later.

Should a visitor be shown in a safety demo?

Yes, as the last scene. It shows the control of entry to the site and completes the picture of safety.

What to do if the alarm did not appear on the map?

Check whether the location is attached to the ALARM or SOS template and whether the template has sound playback enabled on the map.

A ready demo script for your plant

We will match the order of scenes to the roles of the meeting participants and prepare the templates on your demonstration instance.

Let's talk