InnerWeb
Skip to main content

FAQ: trainees and students at the plant, induction training step by step

A trainee who comes for one day or for several weeks needs the same two things: a valid induction training and an entry record. Below we have collected the questions HR and the trainee supervisor ask most often, with answers based on how the InnerWeb registration station works.

34 min
lifetime of a training group on the server
Source: card
4
language versions supported by the reactor
Source: card

How does a trainee's induction training work at the station?

The registration station is an unattended screen with a USB HID scanner as its only input device. There is no keyboard, no login and no field for typing a code, so a trainee cannot mistype or bypass anything. It is enough to scan the QR code label received at the reception desk or in the invitation.

The scan returns one of three answers. A person with a valid training sees a welcome screen. A person without a valid training gets the induction video played straight away. After a break longer than the rescan window, the exit is recorded. The trainee supervisor does not need to stand next to the screen and switch materials, because the sequence follows from the status of the trainee's account.

For HR there is one practical consequence: the proof of training is created at the moment the video ends, not when someone remembers to sign a list.

Can trainees be trained as a group?

Yes. The induction training at the station can be played for the whole group at once, and the group completion records the entry for every participant with one click. With ten vocational school students, the safety instructor does not repeat the same briefing ten times.

The training group is kept on the server and expires after 34 minutes. The screen shows only its own view, so a person who was not added to the group is not credited by accident. This matters on the day when someone else walks past the group of trainees.

The group size limit at the station is checked before the request is sent. A scan of a person without training, made while a training, welcome or completion is in progress, does not add that person to the group. A late trainee scans again at the next session.

What happens if the video does not load?

Interrupting the training, for example because the material failed to load, clears the group on the server. This means an abandoned group is not credited at the next session. The supervisor starts again, and the register does not show a training that nobody watched.

Field limits at trainee registration

Field limits at trainee registrationHorizontal bar chart: first name 20 characters, last name 30 characters, note 64 characters.020406080charactersFirst nameFirst name: 20 characters20Last nameLast name: 30 characters30NoteNote: 64 characters64
Source: Documentation of the guest registration function

In which language does the trainee watch the video?

The language of the guest account, selected at the desk, decides which version of the training video and interface is used. Polish and English are available by default, and the reactor also supports Russian and Ukrainian. The plant can narrow the list with a setting if it does not want to offer every version.

For HR the moment of choice matters: the person at the reception desk sets the language when the account is created, so there is no need to ask the trainee in front of the screen which language they want the instruction in. For a university with exchange programmes, a student from abroad sees the same scope of content as a Polish classmate, just in their own version.

If a trainee understands neither of the two available languages well, the supervisor should report this at registration. The plant then decides whether to add an oral explanation of the rules, while the video remains the basic material.

What personal data of a trainee goes into the system?

Reception registers a guest by first name and last name, up to 20 and 30 characters respectively, and a note of up to 64 characters. The account with its registration number and the QR label printout are created in a single transaction. There is therefore no intermediate state in which the account exists and the label cannot be printed.

For bulk invitations the system does not create accounts in advance: the person registers on their own. For a school or university this means we do not send the plant full lists of data that it only needs on the day of the visit. Data minimisation is a result of the process here, not a separate procedure.

The note field of 64 characters is meant for organisational information, for example a class name or a university name. Sensitive or health data must not be entered there.

  • first name up to 20 characters and last name up to 30 characters
  • organisational note up to 64 characters
  • account language selected at the desk
  • registration number and QR label created together

Does a trainee have to sign a health declaration?

It depends on the plant's settings. When the health declaration is switched on, a person without today's declaration does not enter, and the entry is not recorded. The function is off by default, so a plant that does not need it does not see an extra step.

In food and pharmaceutical plants the requirement usually follows from quality standards and customer audits. In that case the declaration also covers trainees, with no exception for school groups. The trainee supervisor should know this before the day of arrival, so that the students can be told in advance.

What about multi-week placements?

The rescan window is sliding and set in seconds, with a minimum of one second. A person who scans every dozen or so seconds is welcomed again and stays on the list of people present, and the exit is recorded only after a real break. A trainee who returns from a break does not repeat the training, provided its validity has not expired.

For a placement of several weeks one account and one label are enough. HR decides only whether the validity of the training covers the whole placement period or needs a refresh halfway through.

Video

Frequently asked questions

Can a trainee without a phone complete the training?

Yes, if they received a printed QR label at reception. The station has only a scanner, so a phone is not needed for the training itself.

What if someone was added to the group by mistake?

The screen shows the group view, and the completion covers only the people listed in it. A mistake is corrected before the completion is clicked, and after an interrupted training the group is cleared.

Does the induction training replace the workstation instruction?

No. The induction video covers entry to the site and general rules. The instruction at a specific workstation remains the responsibility of the line manager.

Who can see that a trainee is on site?

After the scan the person appears on the list of people present, and security sees them on the evacuation list from the moment of the scan, even while the training is still running.

Want to see group training at the station?

We will walk you through the flow from the QR label to the group completion, using an example from your plant. Book a short demo with the trainee supervisor and the safety manager.

Let's talk