InnerWeb
Skip to main content

FAQ: time-limited guest permits and the visit host

A time-limited guest permit is a planned visit with a host: for one day or for a series of days. Reception staff and hosts most often ask about planning limits, who may plan a visit and what happens with the phone call to the host at the first entry. Below are answers based on how the guest registration module behaves.

377
days ahead on which a visit can be planned
Source: visit module documentation
34
days planned in one series
Source: visit module documentation
3 min
window for collecting one host's guests into a group call
Source: visit module documentation

What is a planned visit and what does it remove for the guest?

A planned visit is the equivalent of a one-day permit for a person who arrives without any work to perform: for a meeting, an audit, training or a tour. It removes only the requirement for a work permit. Training, qualifications and an active account still decide on entry, so a visit is not a general pass.

As a result, reception does not issue a separate work permit for someone who does nothing on the premises except talk. At the same time, a guest who has not passed the OHS induction still gets a red verdict at the entrance.

How do you plan a multi-day visit?

A visit can be planned for any days from today, up to 377 days ahead and up to 34 days at once. A day with an existing visit is skipped, so planning an overlapping range again does not create duplicates.

In practice, reception sets the rhythm in three steps: first the range of days, then the host, and finally the list of guests with a notification channel. For a project lasting 3 months, you plan in series, for example 30 days at a time, so as not to exceed the 34-day limit.

  • Pick the days from the calendar instead of entering a range, if guests arrive every other day.
  • Plan the series for a full working week at once, if visits are daily.
  • Before the next series, check that the guests have a valid training for the whole period.

Visit planning limits

Visit planning limitsBar chart: 377 days of planning ahead and 34 days in one series.0100200300400daysMaximum ahead: 377 days377 daysMaximum aheadMaximum in one series: 34 days34 daysMaximum in one series
Source: InnerWeb visit module documentation

Who is the host and who may plan a visit?

Every planned visit has a host, who is an active internal employee. The coordinator of an external company does not plan visits for their own people, because they would bypass the permit requirement: an external company gets access through a work permit, not through a visit.

The host is responsible for the guest on site: they answer the dispatcher's call at the first entry, confirm the purpose of the visit and know where the guest is. Choose hosts from people who will actually be at the plant on the day of the visit, not from a list of managers who are away from the floor.

What happens at the guest's first entry?

At the first entry of a guest on the day of the visit, the dispatcher calls the host once. Further guests of the same host who enter within 3 minutes are collected into one group call after 30 seconds of silence. This reduces the number of calls for delegations and school groups, where several people appear at the gate a few minutes apart.

The call does not close the matter automatically: it is information for the host that a guest is standing at the entrance. The decision to enter depends on the verdict, and the call lets the host come to meet the guest.

What to do when the host does not answer or has no phone number?

The host not answering is not a reason for reception to change the entry rules on its own. The guest waits in the reception area, and the dispatcher retries contact with the host or with the deputy named when planning. If the host has no phone number in their profile, completing the profile is a task to do before the day of the visit, because on the day of arrival it will be too late.

Good practice: when planning a series of visits, enter as host a person who has a phone number and a duty roster, and leave a deputy in the visit note. For questions about how long to wait, set an internal rule, for example three attempts a few minutes apart, after which the matter goes to the shift supervisor.

Does a visit replace the guest's OHS training?

No. A visit removes only the permit requirement. The OHS induction for guests, that is a short video training in the language version for the person or group, remains a condition of the verdict. For multi-day guests, set the rule that the training covers the whole visit period, and check its validity before each new series.

If an external company is to carry out work on the premises, a planned visit is the wrong tool: a work permit with a stay limit and a host is needed.

Video

Frequently asked questions

Can an external company plan a visit for its own people?

No. The coordinator of an external company does not plan visits, because a visit removes the permit requirement. An external company enters on the basis of a work permit.

What about a day on which a guest already has a visit?

Such a day is skipped when planning a series, so no duplicates are created.

Does the dispatcher call the host for every guest?

No. The first guest of the day gives one call, and further guests of the same host within 3 minutes go to a group call after 30 seconds of silence.

Plan visits without paper

We will show during a demo how reception plans series of visits and how the dispatcher connects with the host. Write to the InnerWeb team.

Let's talk