Access schedule for three shifts in a hall: scenario

The production planner and plant security of a three-shift plant must agree when each group may enter the hall. Below is a scenario for a production plant with several staffing agencies: how to set entry windows so that a late person does not stop the line, and every refusal leaves a trace in the register.

5 seconds
window for ignoring a repeated scan of the same code
Source: unit card
3
working shifts in the scenario
Source: scenario assumption

Problem: a fixed rule does not fit a changing roster

In a three-shift plant the same person is often on the morning, afternoon and night shift within one month. If the access schedule in the access control system is fixed to one shift, entry on another shift ends in a refusal, even though the roster matches the production plan.

On the other hand a window that is too wide (for example the whole day for a whole agency) makes the schedule pointless. The aim of the scenario is a compromise: a window derived from the roster with a short margin, and a clear path for exceptions.

Who is responsible for what

The production planner knows the roster and the number of people on the line. Security knows the passages and the refusal procedure. The IT department or the access control vendor knows the limits of time zones in the controllers. Only a shared sheet brings these three perspectives together.

We recommend describing each staffing agency as a separate group in the access control system with an assigned set of windows, rather than granting permissions person by person. A change in an agency's roster then means changing the group, not editing hundreds of cards.

  • Planner: shift roster and entry margins
  • Security: passages, refusal procedure, register
  • IT or access control vendor: time zones and schedules in controllers
  • Agency coordinator: list of people and shifts

Example entry windows for shifts (minutes around the start)

Example entry windows for shifts (minutes around the start)Bar chart with example entry margins before and after the start of each of the three shifts0102030minMargin before (Shift I): 20 min20 minMargin after (Shift I): 10 min10 minShift IMargin before (Shift II): 20 min20 minMargin after (Shift II): 10 min10 minShift IIMargin before (Shift III): 30 min30 minMargin after (Shift III): 15 min15 minShift III
  • Margin before
  • Margin after
Source: Example calculation: assumed margins to be corrected by measuring the walking time in the plant

Setting the entry windows

Rules of time zones and shift schedules require that readers on both sides of a passage report direction, entry or exit. Without this it is impossible to tell a late entry from an exit before the end of a shift.

For each shift we set a window with a margin before and after its start. The margin before lets people in without a queue, the margin after lets a late person reach their workstation without security intervention. The margin values should come from measuring the walking time from the gate to the hall, not from guesswork.

Night work needs separate attention: the night shift window crosses midnight, and some controllers treat such an interval as two separate days. Checking this case with the access control vendor before go-live saves unpleasant surprises on the first night.

How InnerWeb complements the access control schedule

The entry verdict in the InnerWeb security panel has four components: no missing trainings, no missing qualifications for dangerous work, a permit or visit for today, and an active account. The access control schedule answers the question of time, the InnerWeb verdict answers the question of whether the person is ready to work.

The first scan with a green verdict records an entry, the second an exit, and a scan with a red verdict records a refusal that does not count as presence on site. As a result the refusal register shows how many times and why someone did not enter, and the list of present people does not include people who stood at the gate.

A double scan of the same code within 5 seconds is ignored on the server side, so a nervous double tap does not create false entries.

Late entry without blocking the line

The most common conflict is a person from an agency who arrived a few minutes after the window. Instead of opening the gate by hand without a trace, security approves an exception: an entry in the register with the shift manager as the approving person. The details of this practice are described in a separate material on exceptions in the schedule.

It is important that the refusal is visible to the planner. When the same lack of entries repeats on the same shift, the problem lies in the window or the agency roster, not in people.

Order of launch

The steps below lead from the sheet to a working schedule without stopping production.

  • Collect the shift roster and margins from the walking time measurement
  • Split agencies into groups in the access control system
  • Set the windows and test the night shift
  • One week of observation with a review of the refusal register
  • Correct the windows and approve the exception procedure

Video

Frequently asked questions

Is the access schedule set in InnerWeb?

Time windows and zones are set in the access control system. InnerWeb adds the person's entry verdict, the register of entries and refusals, and location on the map.

What about a night shift crossing midnight?

Check with the access control vendor how the controller treats an interval that crosses midnight, and test it before the first night.

Does a refusal count as presence?

No. A scan with a red verdict records the refusal in the register, but the person is not counted as present on site.