InnerWeb
Skip to main content

Lost employee card at the gate: questions and answers for the security desk officer

The security desk officer at the gate hears the same sentence several times a year: I have lost my card, please let me in. This page collects the questions that come up in that moment, with answers that do not disclose more than necessary and leave a trace of the event in the system.

5 s
server-side window for rejecting a duplicate scan
Source: card
13 s
refresh interval of the On site list
Source: card

First seconds: what the officer establishes before doing anything

The officer first establishes one thing: whether the person says the card is lost or simply not with them. A reported loss starts the loss procedure, while a forgotten card starts the one-day replacement procedure. These are two different paths, and the system tells them apart only if the officer records the correct reason.

The second step is identity confirmation in line with the site rules, for example a document with a photo and confirmation from the line manager. The officer does not base the decision on the person knowing colleagues' names or the hall number. That information is easy to observe.

Can the officer let the person in on their word?

No. Admitting someone on their word bypasses the only proof that the person is entitled to enter and falls outside the attendance record. In the system, a gate scan is a control act: a green verdict records an entry or exit, while a red verdict records a refusal entry that does not count as presence on site. A person admitted without a scan does not appear on the On site list, which is the list used during an evacuation.

Questions about what the system shows at the gate

The officer often asks why the same person is sometimes refused and sometimes admitted. The answer lies in the state of the card, not in the gate itself. A card deactivated after a loss report stops identifying its former holder, because card lookup skips records that carry a deactivation date.

Why does a deactivated card give the same message as an unknown card?

This is by design. An unknown code and a deactivated code produce the identical error response 404 at the gate, so neither the security desk nor a person holding someone else's code can tell a non-existent code from a deactivated one. A finder of the card cannot learn from the gate that the card belonged to someone and was blocked. The officer should therefore not explain to the person that the code is deactivated, but direct them to the procedure.

Can the officer see what a person refused entry is missing?

Yes, for formal gaps. The refusal entry contains, in the verdict snapshot, the reason and the names of the missing trainings and qualifications, and a refusal also sends a notification stating what is missing. This helps tell a lost card apart from an expired training: in the second case a new card changes nothing.

Why was a second scan of the same code rejected?

A repeated scan of the same code is rejected as a duplicate: the server applies a 5-second window, and the interface adds a further 2584 ms window. The officer should not read this as an intrusion attempt. Most often someone scanned the code twice in a hurry, and the first scan had already recorded the event.

Technical timings the officer sees at the gate

Technical timings the officer sees at the gateHorizontal bar chart: 5 seconds duplicate window on the server, 2.6 seconds in the interface, 13 seconds On site list refresh.051015sDuplicate window on the serverDuplicate window on the server: 5 s5Duplicate window in theinterfaceDuplicate window in the interface: 2.58 s2.58On site list refreshOn site list refresh: 13 s13
Source: Security panel and QR gate control feature cards

Questions about what the officer may say

The rule for the officer is simple: they say what the person should do, not what they know about the person's account. If the person reporting the loss is an employee, they are told that the loss report is accepted at the gate or by their line manager and that the card will be blocked in the access control system. They are not told where the card was last used.

  • May be said: that the card will be blocked, that a replacement card or a temporary badge applies until a new card is issued, and whom to contact next (HR, IT department or the secretariat).
  • Must not be said: whether the card was used after it was lost, at which gate and at what time. This is information for the attendance review carried out by security and IT, not for a conversation at the barrier.
  • Must not be confirmed to a third party that a given employee lost a card. Questions about someone else's card are directed to that person's line manager.

Questions about blocking, the replacement card and the temporary badge

Blocking the physical card falls to the access control system. InnerWeb is a software manufacturer that does not sell or install the active cards, readers and label printers, so the procedure for blocking the physical card sits with the access control system, while the access and attendance procedure sits with InnerWeb. The officer therefore performs two actions in parallel: reports the block to the access control administrator and records the event in the security system.

Until a new card is issued, the person receives a badge with a QR code. The rule of one active badge per person is enforced in the application by a transactional lock, so issuing a new badge does not leave two valid at the same time. Deactivation creates a new record instead of overwriting the old one, so the person's badge history stays in the system.

What to do when the scanner returns an unknown code although the badge is valid?

An incorrect keyboard layout on the scanner can turn a valid QR code into an unknown one. The system then makes a second matching attempt with the reversed keyboard layout, so the problem usually resolves itself. If refusals persist after the scanner interface is changed, for example from USB keyboard to serial port, check the symbology settings, because changing the interface restores the default values.

The question the officer asks at the end of the shift

At the end of the shift the officer checks that every loss report from their shift is complete: the reason, the time, the person who accepted it and confirmation that it was passed on to HR and IT. The On site list is built from gate scans and refreshes every 13 seconds, so the officer can see whether a person whose card is now invalid still appears as present from an earlier scan.

Checklist

Video

Frequently asked questions

Can the officer check whether the lost card was used after it was reported?

The officer sees entries from their own gate, but the full review of attendance is carried out by security or IT after the report. The result of the review is not given to the reporting person at the barrier, but to their line manager.

Does the card number appear in the security panel?

No. The badge token is printed only on the label and does not appear in any response of the security panel interface. The panel returns only derived facts, for example whether the person has an active badge.

Is a temporary badge enough to enter the site?

Yes, if the person holds the valid trainings and qualifications required for entry. The badge confirms identity in the system but does not bypass the check for gaps, and a refusal will still indicate what is missing.

Want to see the security panel at the gate?

We will show a scan, a refusal with its reason and the On site list on demonstration data. Book a conversation with the InnerWeb team.

Let's talk