Core rule: block first, search later
A reported lost card should be blocked in the access control system at once, and the replacement card receives a new number and a new link to the person. Searching for the card in changing rooms and the car park can take hours, and during that time the card opens the gate for anyone who finds it.
If the card is found, it does not return to circulation: it stays blocked, and the employee uses the replacement card. Such a rule removes the temptation to unblock for convenience and simplifies the register.
The first hour on the night shift
On the night shift the plant usually has no HR employee, so the block is carried out by the security duty officer. The procedure should fit on one page and be kept at the station: the report number, first and last name, the time of the report, the block in the system, and a register entry with the person who carried out the operation.
The employee cannot wait until morning at the gate. The duty officer issues a temporary card valid until the end of the shift, with access only to the zones where the person works. The temporary card carries a visual marking and is returned at the end of the shift.
Risk window after reporting a lost card (assumption)
- Block the next day
- Block in the first hour
The next day: HR and issuing the replacement card
In the morning HR confirms the identity of the person and the circumstances of the loss: where, when, and whether the card could have been stolen. If theft is suspected, security is informed, and the entry log from the last hours before the report is checked for taps that the person did not make.
The replacement card goes through the full personalisation process with a new number. The old number remains in the register with the status blocked and the reason for the change: loss, date, reporting person. The old number must never be copied onto a new card.
Register: what to record
The card register should contain the number, the person, the issue date, the status (active, blocked, returned), the reason for the change and the person who carried out the operation. For a block, additionally the time of the report and the time of the block in the system: the difference is the exposure time, which the plant can measure and shorten.
During an audit this single row answers three questions: who reported it, who blocked it, and how long it took. The absence of the report time means that the exposure time is not measured.
Sample calculation: what a delayed block costs
Sample assumptions: the plant employs 600 people, around 36 lost cards are reported per year (6 percent), and a block after one hour instead of after 8 hours shortens the risk window by 7 hours per report. This gives 252 fewer hours of exposure per year. These are assumptions to be recalculated for your own plant, not data from a specific site.
The value of this calculation does not lie in the result, but in the question it forces: how many hours is the card active after the report? If the answer is more than one hour, the night procedure needs improvement.
Rehearsing the procedure and measures
A procedure that nobody has rehearsed fails at two in the morning. Once a quarter the security duty officer carries out a trial block of a test card and measures the time from the report to the block in the system. The result is recorded in the register together with notes on what got in the way: no access to the system, an unknown card number, no procedure at the station.
Two measures are enough for assessment: the time from report to block, and the share of reports with a complete register entry. The target for a three-shift plant is a block within the first hour for every report and complete entries. If any measure is not met, the cause is analysed at the quarterly review together with HR.
It is also worth checking whether employees know whom to report a loss to outside HR working hours. The security duty officer's number on the back of the replacement card or on a notice at the exit shortens the reporting time more than any technical fix.
What to automate and what to leave to people
InnerWeb receives card tap events from the access control system and shows them with the person, the place and the time, so when theft is suspected it is quick to see whether the blocked card was used after the report. InnerWeb does not carry out the block itself: it is performed by the client's access control system.
Leave the decision on issuing a replacement card and on any cost for the employee to HR. The technical procedure is the same regardless of the cause of the loss.
Checklist
Video
Frequently asked questions
Who blocks the card at night?
The security duty officer, following a one-page procedure, with an entry in the register.
Can a found card be unblocked?
We recommend not. The card stays blocked, and the employee uses a replacement card with a new number.
How does the employee enter work after a report?
They receive a temporary card with limited validity and zones, returned after the shift.
What should be checked if theft is suspected?
The register of taps from the hours before and after the report, looking for taps the person did not make.
Sources
Shorten the time from report to block
We will help describe the night procedure and show the card tap events after a report in one view.
Let's talk