Questions about data and demo status
The most common question is: do we see our plant? Yes, the hall geometry, building shapes and locations with transmitter numbers come from plant data. However, this is not a production installation. The demo runs on a separate demo instance with its own area, its own locations and transmitters marked with an external identifier, separated from production data.
The second question is what is real. The presenter should say it honestly: the map, permit templates, visitor path and alarm response are real system functions. Movement of workers and vehicles is simulated with demo accounts. The board therefore assesses how the system works and how clear it is, not hall statistics, because those do not exist yet.
Is the demo already a deployment?
No. It is a rollout scenario: we show how the system would look in this plant. Production data, employee accounts and real notifications stay outside the demo. Demo accounts use addresses in a domain reserved for testing, so no notification reaches a live person.
Where does the hall data come from?
The demo data is the georeferencing of the hall (reference point and rotation angle of the plan relative to north), building shapes and locations with transmitter numbers. The plant provides the plan and we place it on the map. Preparing this data is the largest item of work before the meeting.
Questions about alarms: SOS, no movement and sound
The board and the plant director quickly ask about the worst case: what happens when a worker is alone and loses consciousness. The answer has two layers. The SOS alarm on the watch starts with a triple click or a long press of the button, followed by a three-second countdown that allows cancellation, which limits false alarms. No-movement is detected on two sides: the app analyzes the device sensors, the server measures time independently, and a full alarm is created only when both agree.
Once the threshold is crossed, the system sends a push and an e-mail, creates a work permit from the ALARM template, marks the alarm on the map and can trigger an external webhook. The last point matters for safety: the alarm can be passed to an existing dispatch system.
Why did the siren not sound during the demo?
The most common cause is a sound block in the browser: without a user gesture, sound does not play, so after opening the map you must click once inside it. The second cause is a template without the map sound option, because such a report is silent by design. Details are in the separate page about alarm sound on the map.
Does the alarm appear immediately?
The work feed for the map is polled every 3 s, so the alarm appears on the map within a few seconds of creating the permit. The presenter should not promise real time in the millisecond sense, only a few seconds.
Alarm timing parameters in the demo
Questions about permits and visitors
The health and safety department asks whether hazardous work permits can be built from our templates. The new permit wizard has seven steps: basic data, hazardous work, tasks, risks, workers, notifications and a summary with print preview. Risks and protective measures are assigned to a location, so a permit in a given hall immediately shows the risks of that place. A template with automatic approval gives the work active status at once, which shortens the demo scenario.
Security and reception ask about visitors. We show registration at a kiosk with a QR code in the invitation and a QR visitor badge printed at reception. The daily health declaration is a feature disabled by default: when enabled, a visitor without today's declaration does not enter, and the entry is not recorded. It is worth stating this so the board knows it is an optional setting, not an imposed one.
Questions about integrations and architecture
IT asks whether InnerWeb replaces the access control system, time and attendance or HR. It does not. InnerWeb is an independent system complementing the client's existing systems (access control, time and attendance, HR, ERP). Location works without GPS, using signals from several transmitters averaged on the map. InnerWeb does not manufacture access control readers: it receives events from the plant's access control system and links them to permits, qualifications and attendance.
The question about the company's experience is closed with figures from the brief: 20 deployments and pilots and a 100% conversion from pilot to deployment. We do not give names of other clients or numbers from their plants.
Questions about the pilot and the next step
The board usually ends with the pilot question: what next, who on the plant side, how long will it take. A well-prepared answer is a proposed scope: one hall or zone, a defined user group, success indicators set before the start and a decision date. The demo has the advantage that it filters out functions that do not fit the plant before a paid pilot starts, so the pilot can be narrower and shorter.
Write down the board's questions and conclusions on the day of the demo. A dedicated post-demo checklist serves this purpose, and the page on demo savings instead of a pilot supports the purchase decision.
Video
Frequently asked questions
Will the board see data from the real hall?
They will see the geometry, building shapes and plant locations, but worker movement is simulated with demo accounts. Production data and real notifications stay outside the demo.
Does the demo require installing anything at the plant?
No. The demo runs in a browser on a separate demo instance. You need a computer with sound, network access and logged-in demo accounts.
Does InnerWeb supply readers and cards?
No. InnerWeb is a software vendor and integrates with the plant's existing access control system, receiving card swipe events.
When is the pilot decision made?
After the demo conclusions are written down: which functions the board wants to test, in which hall and with which indicators. The demo shortens the path because it filters out functions that do not fit the plant.
Book a demo on your plant's data
We will prepare a demo scenario with the hall map, alarms and the visitor path. Let's talk about scope and date.
Let's talk