How alarm sound works on the map
The online map plays the siren when a new work item appears in the work feed, coming from a template marked with map sound playback. A silent report is a template without this option: the work is visible on the map, but without a signal. This distinction is deliberate, because not every permit should trigger an alarm in the dispatch room.
The SOS siren lasts 5.3 s and repeats twice. A second work item appearing during the signal does not play a second sound, so no cacophony arises. The work feed for the map is polled every 3 s, so from creating the permit to the signal usually takes a few seconds.
Cause number one: the browser blocks sound
Browsers block sound without a user gesture. For the demo this means a simple rule: after opening the map, click once inside it, otherwise the siren will not play even if everything else is set correctly. This is not a system fault but a browser policy described in the documentation for web developers.
The presenter should do this click every time, including on a computer that worked the day before. After the page reloads, the permission disappears. It is also worth checking that the browser tab is not muted and that the computer audio output points to the right speakers or the conference room.
- click the map after each opening or reload of the page
- check that the tab has no mute icon
- check the operating system audio output (room speakers, not headphones)
- run a test signal before the board enters
Timings in the SOS alarm cycle on the map
Cause number two: a template without sound
If the click did not help, check the permit template used in the scenario. Only work from a template marked with map sound playback makes a sound. A permit created from another template appears on the map without a signal. At demos, people often create it from a template that looked similar but lacks this option.
Two templates have a special meaning on the map. No-movement is drawn only for a permit from the template named ALARM, and SOS only for the template named SOS. Without attaching a location to the template, the alarm exists only in the cache and is not visible on the map. Therefore, in the demo data, each of these templates must have a hall location assigned.
Cause number three: existing work, not new
After the first load of the hall, the map only remembers the existing work items and does not ring. Sound is triggered only by new work items that appear after this load. So if the SOS permit was created before the map was opened, the siren will not play. The sequence is therefore: open the map, click it, wait for the first polling cycle, and only then start the alarm.
When planning the scenario, write this order in the presenter's notes. For the board, the siren is the strongest moment of the demo, so there is no room for improvisation.
How to test sound before the demo
The test takes a few minutes. Open the map on the presentation computer, click it, create an SOS permit from the sound-enabled template on a demo account, wait a few seconds and check whether the signal can be heard in the room. Then stop the demo and clear the markers so the board does not see leftovers from the test. Detailed steps are in the demo run guide.
If the demo takes place in a room with an external sound system, also check whether the operating system did not redirect browser audio to another device, for example wireless headphones. This is a common cause of silence despite correct configuration. A spare computer with the same setup shortens any possible failure to a few dozen seconds.
Video
Frequently asked questions
The siren did not play, but the alarm is visible on the map. What should I check first?
First the click in the map after opening it, because the browser blocks sound without a user gesture. Then the template: it must have map sound playback enabled.
Why does the sound stop working after reloading the page?
Permission for sound applies to the current page load. After a reload you must click the map again, and work that already existed will not trigger the siren.
Will two alarms play two sirens at once?
No. A second work item appearing during the signal does not add a second sound. The map plays one signal lasting 5.3 s with two repetitions.
Is a silent report a configuration error?
No, it is a deliberate option. A template without map sound creates a report visible without a signal, useful for less urgent work.
Sources
Want to see the SOS alarm on your hall map?
We will show the full scenario with sound, no-movement detection and permits on your plant data. Book a call about the date.
Let's talk