How many labels can be printed at once and what the limits are
One group invitation covers up to 144 e-mail addresses. This batch size comes from practice: it is enough for a large group from one external company, and it lets the front office keep a stack of labels under control at a single station.
The system also applies a limiter on group invitations: 5 invitations per 13 minutes for each user. With full batches this gives up to 720 invitations on the day of a mass rollout, that is 5 times 144. The limiter protects against an accidental or abusive mass send, and does not get in the way of normal work, because a normal day means a few invitations, not several hundred.
If on the opening day of the plant a large group of guests means the batch crosses that boundary, it is enough to split the invitations between several people who invite. The limiter counts per user, so spreading the work across a few people needs no change to the configuration.
- up to 144 addresses in one group invitation
- 5 group invitations per 13 minutes per user
- up to 720 invitations on a mass registration day for one inviting person
When the front office receives the print request and what the e-mail contains
The print request is an e-mail to the front office, sent only when the administrator has set the front office address. By default this field is empty, so the function stays hidden until someone deliberately enables it. The field accepts an empty value or a valid e-mail address; an incorrect value rejects the save of the whole settings tab.
When a single guest is invited, the e-mail goes out at once and contains information about who was invited, for which days and by whom, together with a request for the label. A failed e-mail does not block the invitation itself: the guest receives the invitation whether or not the front office mailbox is working.
A group invitation works differently. Invitations at that stage know only the e-mail addresses, without an account and without a QR code, so there is nothing to print yet. The request waits for guest registration: once all invited people have registered, the e-mail goes out immediately; after 8 hours it goes out with the people already registered, and late arrivals receive a separate e-mail. After 13 days the request stops waiting, and the system checks open requests every 5 minutes.
Limits and times of the label print request
Who may print the labels
The print request e-mail contains a Print button, which opens the page printing all labels from a given invitation. The page is available only after logging in with the administrator or security role. A person without such a role who receives the forwarded link sees the login screen, not the guest data.
This matters for data protection: the label contains the guest's first name, last name and company, and the QR code is a pass. That is why printing is an activity limited by role, not a link available to anyone who receives the message.
Each print records who last printed a given label and when. Printing again does not change the token, it only updates that record, so if in doubt the head of security can see who printed it last.
What to do when a guest loses the label or leaves it with a colleague
The label contains a QR code with an address and a random 64-character hexadecimal token, generated from 32 random bytes. The token is never a sequence number, identifier or date, so it cannot be guessed or derived from another badge.
When a badge is lost, it is deactivated and the system issues a new token; the old record stays in the history, which gives evidence for an audit. The old label stops working at the gate, and the new one is printed from scratch. There is no need to create a new guest account or repeat the training.
The public address of the QR code redirects without checking the token and does not reveal whether the token is valid, revoked or invented. As a result, a person who finds a lost label learns nothing about its status, and an attacker cannot identify active badges by trial and error.
Does the label have to match a specific printer
The default label format is 86 by 54 mm, and the permitted size range is 13 to 233 mm. The QR code is at least 13 mm regardless of the format, because below that size gate scanners read it unreliably.
When printing from a browser, the label printer driver prints on its own paper format and ignores the page size declared by the web page. That is why the label design fills the whole format given by the driver, and the paper, zero margins and 100% scale are set once at the workstation. After that setup, every further print is repeatable.
Video
Frequently asked questions
Does the front office need a special printer?
A label printer bought and integrated with the workstation is enough. InnerWeb is a software vendor, not a hardware supplier, so it does not supply readers or cards. The browser print window works as a backup solution.
Does the guest also receive the QR code by e-mail?
The access QR code e-mail goes to the person only once, and only after the required training is passed. Reception guests who have a printed label do not receive an SMS with a link.
What if the front office e-mail does not arrive?
The guest invitation is not blocked by this. The label can also be printed from the print list on the registration screen, without the e-mail.
Does a group invitation send the request immediately?
No. The request waits for guest registration: it goes out at once when everyone has registered, and at the latest after 8 hours with the people already registered.
We will show label printing on your scenario
Book a call about guest registration and badge printing. We will go through the limits and roles on the example of your front office.
Let's talk