What the guard needs to know before standing at the kiosk
The registration station works as an unattended screen. The only input device is a USB HID scanner. There is no keyboard, no login and no field for typing a code. The reason is practical: nobody can read a QR code by eye, and a text field would only invite mistakes and attempts to bypass the check. The guard therefore does not operate a menu. The guard watches the screen and reacts to what the system has decided after the scan.
That is why the first question from the head of security to the implementation team is usually: who decides, the person or the system? The answer is that the system decides on entry based on account data, training records and permits, and the guard is responsible for situations in which the screen shows a refusal or a fault message. The company buys and integrates the hardware (kiosk, scanner, tablet). InnerWeb delivers the software of the station.
Four answers after a code scan
Every scan ends with one of four answers. Knowing them in advance shortens guard training to about a dozen minutes, because the whole logic comes down to four scenarios.
Entry means that the person meets all conditions and the system records the entry. Still inside is a repeated welcome for a person who is already on site and scans the code again, for example out of curiosity or by accident. Exit appears when the time since the last scan is longer than the rescan window. A refusal with the start of training applies to a person who lacks a valid introductory safety training.
- Entry: entry is recorded and a welcome is shown.
- Still inside: welcome repeated, no new entry is recorded.
- Exit: exit is recorded after a break longer than the window.
- Refusal: training starts and the reason is shown.
Station parameters the guard should know
How long the rescan window lasts and why it does not start at entry
The most common misunderstanding concerns exit. The guard sees that a guest scans the code twice and asks whether this is an exit. It is not, if the scan falls inside the rescan window. The window is counted from the last scan of a person who is on site, it is set in seconds, and in one of the deployments it is 34 seconds. An exit is recorded only after a real break.
The practical effect is that a guest group entering together, where each person presents the code to the scanner one after another, does not generate false exits. The head of security can adjust the window to the throughput of the gate: with heavy traffic during a shift a shorter window reduces the queue, while with light traffic a longer window protects against an accidental exit record.
How to set the window
Start with the value from the previous deployment, measure for one week how many guests scan twice in a row, and correct the window by a few seconds. The change is a setting and does not require a new software version.
A guest without valid training: what happens on the screen
The scan at the station decides what happens next. A person with valid training receives a welcome. A person without valid training immediately gets the introductory safety video, also when several people stand at the kiosk at once, so the guard does not have to lead anyone to a separate room or start a video by hand.
The guard should know one thing: playing the introductory training is not a refusal caused by the guest's fault. It is a normal step of the process. When a group of several people stands at the kiosk, the training plays for all of them at the same time. Only after it ends and the result is saved does the next scan grant entry. In plants with guests from abroad it matters that the account language matches the guest's language, because the video and the training interface depend on it.
Network or server failure: does the evacuation list lose people
Every reasonable head of security asks this question. When the infrastructure fails (a server error or a response timeout), the operator sees a clear message. The design goal is that an unreachable back end never looks like an unrecognised identifier, and that the evacuation list never loses a person silently.
In practice this gives the guard a simple instruction: a message about an infrastructure fault is not a refusal for the guest. You do not tell the guest that the code is wrong. You ask for a moment, report the fault according to the procedure and, if needed, record the entry by hand according to the emergency procedure of the plant. It is worth rehearsing this once before the launch, because the first time always takes longer.
Badges with a QR code: who prints them and how many at once
The label printing page sits under the roles of security and the secretariat. It accepts up to 144 identifiers at once. For a single label the system offers a choice of size, and for many labels it lays out a sheet. A guard with security permissions can therefore print identifiers for a whole group without help from the secretariat.
If the plant has its own rules for identifiers, for example a different size for one-day guests, agree them with the head of security before the start and record them in the station instruction. The print form does not impose a visual policy. It only arranges the data on the label.
Video
Frequently asked questions
Can the guard type the code by hand if the scanner does not read it?
The station has no field for typing a code and no keyboard, because nobody can read a QR code by eye. If the scanner does not work, you report the device fault and follow the emergency procedure of the plant.
What to do when the screen shows a fault message instead of a refusal?
Do not treat it as a refusal for the guest. It is a message that the infrastructure is unavailable, designed to separate a fault from an unrecognised identifier. Report the problem and record the entry according to the emergency procedure.
Who prints the labels when the secretariat has not yet started work?
The label printing page is handled by the security and secretariat roles, so in the morning a guard with security permissions can do it. One print job covers up to 144 identifiers.
Does InnerWeb supply the kiosk and the scanner?
InnerWeb is a software producer. The plant buys and integrates kiosks, scanners, tablets and label printers, and we configure the registration station.
Let us rehearse the kiosk shift before go-live
Book a call with the head of security and IT. We will show the four scan answers on the scenario of your gate and agree the emergency procedure.
Let's talk