InnerWeb
Skip to main content

Self-service entry registration with a scanner: best practices

A screen with a scanner alone protects the evacuation list if six rules are followed: one input of data, a properly set scan window, readable failure messages, a separation of failures from unrecognised badges, control of the To print list and securing access. Each one is explained below with its rationale.

34 s
re-scan window in one implementation
Source: internal card
89
maximum number of items on the To print list
Source: internal card

Why self-service requires discipline

Self-service entry works without a person at the gate, so every decision must come from data. At night and during shifts, when there is one person on security duty, the screen is the only witness to the entry. If it records an exit instead of an entry, or silently skips a person, the evacuation list has a gap that nobody notices until an alarm.

Good practices therefore concern not the appearance of the screen but its behaviour in borderline situations: a double scan, a server failure, a group of people, a lack of training.

Six rules for a screen working with a scanner

The rules follow from the mechanism of the registration station and from the experience of plants where the station works around the clock.

Rule 1: the scanner is the only data input

The station has no keyboard, no login and no field for typing a code. Nobody can read a QR code by eye, and a field would serve only for mistakes. Secure the housing so that nobody connects a keyboard, because that opens the way to bypassing the rules.

Rule 2: set the re-scan window to the real walking time

The window moves from the last scan of a person who is on site and is set in seconds. In one implementation it is 34 seconds. A window that is too short turns a welcome into a false exit, and one that is too long delays the recording of a real exit. Check the walk from the gate to the screen and match the window to it.

Rule 3: an infrastructure failure has its own message

A server error or a timeout shows the operator a readable message. In this way an unreachable backend does not look like an unrecognised badge, and the evacuation list does not silently lose a person. Train security that a failure message means a manual entry record and a report to IT.

Rule 4: control the To print QR code list

The list shows people with training activity in the last 13 days who have never been issued a badge. It refreshes every 34 seconds and returns at most 89 items. A review of the list at the start of a shift shows who takes part in training but does not yet have a label.

Rule 5: every refusal has a reason shown on the screen

A refusal gives the reason: inactive account, no health declaration, no training, no qualifications, expired permit, no permit or planned visit, or other. The operator does not guess and does not have to ask the guest for details.

Rule 6: protect the two secrets of the station

Two different secrets protect the station: the station token added by the intermediary server, which never reaches the browser, and the access token contained in the address, which the administrator rotates with one confirmed click in the settings. An empty or deleted token closes the station instead of opening it.

Parameters of the self-service station

Parameters of the self-service stationChart: scan window 34 s, refresh 34 s, 89 list items, activity window 13 days.020406080100valueScan window (s): 34 value34 valueScan window (s)List refresh (s): 34 value34 valueList refresh (s)List items: 89 value89 valueList itemsActivity window (days): 13 value13 valueActivity window(days)
Source: Documentation of the registration station

Night, shift and breaks in service

The greatest risk of gaps in the list occurs at shift changes and at night. The people in security change at the shift change, and a group of employees from external companies often gathers at the gate. Make it the first task of a new shift to glance at the station: does the screen respond, does the scanner light up, does the To print list have no backlog.

At night, when traffic is low and security works alone, a message about an infrastructure failure is the most important signal. Write in the instructions whom to notify in that case and how to record an entry by hand, so that after the repair the evacuation list is complete. Review the night entries in the morning, before the day shift starts work.

How to check the rules in practice

Run four trials: a double scan within a time shorter than the window, a scan after a break longer than the window, a scan with the test server switched off, and a scan of a person without training. Record the result of each trial. Repeat the trials after every change in network or station software, especially before a period of increased traffic.

Checklist

Video

Frequently asked questions

What does the operator see when the server does not respond?

A readable failure message, not a message about an unrecognised badge. This way a person is not silently skipped on the evacuation list.

How often does the To print QR code list refresh?

Every 34 seconds. It returns at most 89 items of people active in training over the last 13 days.

Does the access token go into the browser memory?

No. The access token is 42 hexadecimal characters and is not copied into the browser memory. An empty or deleted token closes the station.

Let's check self-service rules at your plant

Book a talk about the registration station with a scanner. We will go through the four borderline trials in a demonstration.

Let's talk