How to read this page
This page is not a legal opinion and does not replace the analysis carried out by your DPO. It shows which data actually passes through the InnerWeb system, so that the inspector can assess the risk on concrete facts rather than on assumptions about an app on the phone.
The questions are grouped into three blocks: the contents of the code, the data flow, and the division of responsibility. Each answer can be checked during the pilot, so it is worth entering it into the test plan.
Contents of the code and data in the system
The first block concerns what physically sits in the QR code and what the system displays after it is scanned.
Does the QR code contain the employee's personal data?
No. The code contains the plant address with a random token of 64 hexadecimal characters, which is 256 bits, generated by a random number generator. The token is not derived from a number, an identifier or a date, so it cannot be guessed or reconstructed from data about a person.
The first and last name are not stored in the code. They are kept in the plant database and are linked to the token only on the server side.
What does the system show after the code is scanned?
When logging in to a training session, the system shows the first name, last name and company of the code owner, and the training starts only after the person confirms with the button 'Is it you?'. The scan therefore does not log anyone in automatically, and the person can see whose account is about to be opened.
This reduces the risk of error, for example when someone scans another person's code, and gives the DPO a simple proof of the accountability principle.
Which data does a guest provide, and which does an employee?
A guest registered at reception is created with only a first name, last name and phone number. For an employee, the data comes from the plant's own systems, and InnerWeb adds the qualifications and permits that are required anyway before the person can be admitted to work.
Questions on this page by block
Data flow and sending channels
The second block covers the questions from IT and HR about where the code travels and whether it can be passed on further.
Does the code go to a private phone number?
The code goes wherever the plant has a contact for the person: to an e-mail address or, if there is none, by SMS with a link. If there is no channel at all, nothing is sent. Invitations can also be directed to people without an e-mail address, using their phone number or their registration number.
The plant decides whether it uses a work contact or a private one for sending, and records that decision in its documentation.
Can the message with the code be sent more than once?
The message with the code is sent once per person, and this is guaranteed by an atomic column in the database, not by the order in which triggers are called. If sending fails, the flag is released and the queue retries, so the code is not lost silently. For the DPO, this means a predictable number of messages containing data.
When is the code sent at all?
Only once the person has passed the required training. Permits, visits and the health declaration do not block sending. The plant therefore does not distribute codes to people who have not completed the induction.
Is the token visible in the security panel?
No. The badge token is printed only on the physical label and is not returned in the responses of the security panel interface. The guard sees the person and the result of the check, not a string of characters.
Role of the plant, InnerWeb and the access control vendor
The third block sets out responsibilities, because three parties meet in access control.
How does InnerWeb differ from the reader vendor?
InnerWeb is a software producer, not a manufacturer of readers or access control cards. It receives identifier-tap events from the client's access control (KD) system and links them with qualifications, permits, attendance and working time records. Readers and cards remain with the KD vendor, so that vendor's GDPR documentation is a separate part of the analysis.
Is a data protection impact assessment needed?
This is a decision for the DPO and the controller. We recommend describing the purposes, the scope of data, the sending channels and the retention period before the pilot, and then assessing whether an impact assessment is required. The conclusion is entered into the register of processing activities.
Can an employee be required to use a private phone?
The plant should not make admission to work dependent on a private device without an alternative. For that reason it is worth keeping a second route: a printed label with the code or a card issued at reception. The details are set out in the checklist for the DPO, to which we refer below.
What to record before the pilot
A well-prepared DPO note fits on two pages: a list of the data in the code and in the system, the sending channels, the roles (controller, processor, KD vendor), the rules for an alternative for people without a phone, and the way a code is revoked after a device is lost.
Revoking does not overwrite the old entry: the system issues a new code and the old one stops working. As a result, a lost phone does not open the gate, and the history of events remains clear for an audit.
Video
Frequently asked questions
Does the DPO have to approve a pilot with a QR code on the phone?
The form of consent is decided by the data controller. We recommend that the DPO sees the description of the data flow before the first codes are sent and approves the scope of the pilot in writing.
What should be done when an employee does not want to use a phone?
Keep a parallel route: a printed label with a QR code or a card issued at reception. The pilot then measures how many people are satisfied with the phone alone.
Does InnerWeb require an app on the phone?
No. The code opens in a web browser, so there is no installation and no app permissions that the DPO would have to assess separately.
Does a lost phone expose the plant to entry by an unauthorised person?
The risk is limited by revoking the code: the system issues a new code and the old one stops working. HR and security should rehearse the procedure during the pilot.
Sources
Let us talk with your data protection officer
We will prepare for your DPO a summary of the data in the code and in the system, and show the data flow on an example plant. Let us arrange a short conversation before the pilot.
Let's talk