Is a licence a condition of entry in the tender?
In tenders for a location system at a critical plant, a technical security licence is sometimes a condition of entry. It is not a rule for every plant, but it is a common element when the system works with facility protection, records entries and movements of people, or supports alarm handling. The buyer lists it in the qualification conditions to filter out suppliers who lack authorisation to work in facilities that require special protection.
InnerWeb holds the MSWiA licence L-0023/25. For the buyer, the practical approach is to state the licence number and its scope in the answer to the qualification conditions and attach a copy of the document to the offer. The licence should not be described in general terms, because the committee verifies the scope written in the document.
Why does liability insurance appear?
Liability insurance for the protection of persons and property is the second most common condition. It protects the buyer against damage resulting from the operation of the system or its installation, so the committee requires a policy with a guarantee sum and a validity period covering the implementation time.
Document it with a current policy and confirmation of premium payment. If the offer template requires a declaration, attach it in the same file as the policy, so the committee does not have to look for documents in several places.
Reference scale in number of beacons
How to document technical capability and subcontractors?
Technical capability is described through a list of people, experience and tools. In many tenders subcontractors are allowed, provided they meet the same requirements as the contractor. The buyer usually asks who physically installs the devices and who is responsible for configuration.
Make sure a subcontractor holds its own licence and insurance if the tender requires the same conditions. A statement from the main contractor alone is usually not enough, because the committee assesses the documents of every entity that actually enters the site.
How to read a reference of similar scale?
Scale can be measured in two ways: by the number of people covered by the system or by the number of beacons. These are different measures, and the buyer should state in the tender which one is meant. As a reference of beacon scale, InnerWeb points to a municipal deployment: 11,000 beacons in 95 facilities covering more than 120,000 m2 with accuracy better than 1.5 m. The industrial reference is an installation with a network of about 600 beacons.
A good reference for the buyer includes: scope, number of devices, area, the measured result and a contact person who can confirm it. In public materials we describe the entity generically, and disclose its name to the committee in the procedure once the client gives consent.
What else does the committee usually check about the supplier?
InnerWeb is a software producer, and the industrial beacon has an industrial design, a CE declaration and ATEX execution for zones 2/22. The remaining equipment is purchased and integrated by us. InnerWeb does not manufacture access control readers, it integrates with the customer's existing system. This information prevents misunderstandings when assessing who is responsible for which element of the delivery.
Company indicators that fit into the documentation: 16,000 beacons in installations, 20 deployments and pilots, 531 ha of monitored areas and 100% of pilots moving on to deployment.
Video
Frequently asked questions
Can an offer be submitted without a licence?
It depends on the wording of the tender. If the licence is a condition of entry, an offer without it will be rejected. If execution by a licensed subcontractor is allowed, its role must be stated clearly.
Does a reference have to come from a plant of the same type?
The buyer usually specifies a similar scale, not an identical industry. That is why we present references by number of beacons, area and measured accuracy.
How can scale be shown when documents are confidential?
We describe the entity generically, and disclose its name and contact to the committee with the client's consent. Figures, scope and result remain in the documentation.
Does the licence mean InnerWeb manufactures readers?
No. InnerWeb produces the software and the beacon. Readers and cards are purchased and integrated by us, working with the customer's existing access control system.
We will prepare the documents for your tender
We will indicate which documents to attach to the offer: the licence, the policy, the capability list and a description of a reference of similar scale to yours.
Let's talk