What the system knows and what it does not know
The system sees the device, not the person. The watch periodically sends the beacons it hears, signal strength, battery status and state, and from this the platform calculates the position. If the watch lies in a cabinet, the position will be correct, but it concerns the cabinet.
That is why the honest answer to the security question is: location alone is not enough to prove the employee's presence. A second signal is needed, which says the device is being worn, and an organisational procedure that ensures it.
Questions about a watch left in the locker
The most common scenario is a watch that is not returned to the charger after the shift or stays in a jacket pocket.
Will the system recognise that the watch is lying still?
Yes, but with a caveat. The system infers stillness from periodic signals, and it depends on the device and user settings. In the observed configuration the stillness alarm on the device vibrates after 120 s without movement, and it does not vibrate while charging or at rest. A watch on a charger in the locker is therefore recognised as a correct state, and a watch lying on a shelf during a shift as stillness.
What about an employee who is actually standing still?
It is the same signature as a watch put down. The difference is made by the reaction: the employee feels the vibration and confirms it, while an abandoned device does not respond. After 233 s without confirmation from the server the watch switches to a short pulse every 34 s, which additionally helps to find an abandoned device.
Stillness alarm stages in seconds
Questions about handing the watch to a colleague
Handing the device to a colleague does not change the radio signature: the watch is still heard by the same beacons and can still move. No ordinary BLE watch will detect this scenario, because the movement is real, it simply belongs to another person.
Effective protection here relies on a process, not a sensor. The watch is assigned to a person at issue, and it is returned at the end of the shift to one place. A mismatch between who issued the device and who physically wears it becomes visible at return, at the gate or in the locker.
- assign the watch to a person when it is issued
- return to one place at the end of the shift
- random checks at the gate or in the locker
- a clear rule in the regulations: the device is personal
Questions about alarms and security reports
A typical set of alarms for a wearable device is five events: entering a restricted zone, leaving a zone, loss of communication with the tag, low battery and an emergency situation reported by the user. The last known position is shown as outdated with a timestamp.
For security this means that a watch abandoned outside the zone produces a loss of communication and a low battery, not false proof of presence. A position with a timestamp always says since when it has been outdated, so the duty officer knows whether they are looking at the current state.
How does SOS differ from stillness?
Stillness is an inference from signals and depends on settings, while SOS is a deliberate call that works without these safeguards. That is why SOS is proof of a person's presence and intent, and stillness is only a hint.
How to set this up in the pilot
In the pilot, settle three things: who owns the mismatch between issue and return, which stillness time on the watch we treat as a signal to check, and where physically the return takes place. Record the thresholds in the instructions for the shift and rehearse the scenario of an abandoned watch before it happens for real.
Video
Frequently asked questions
Will a watch put away in a locker falsely show presence?
The position will show the locker, but after 120 s without movement stillness appears, and the lack of a user response distinguishes it from a person standing still.
Will a sensor detect a watch handed to a colleague?
No. The movement is real, it just belongs to another person. Effective measures are personal issue, return to one place and random checks.
Will a watch on a charger trigger the stillness alarm?
No. The stillness alarm does not vibrate while charging or at rest.
What is an outdated position?
It is the last known location with a timestamp, shown as outdated when the device has stopped reporting.
Let's set up the issue and return procedure with security
During the pilot we will rehearse the scenario of an abandoned watch and a watch handed to a colleague, so that security has clear thresholds and a named owner of each mismatch.
Let's talk