What a dual-frequency card is
The card contains two independent chips in one body: one works at 125 kHz, the other at 13.56 MHz. An old 125 kHz reader sees only the first chip, and a new 13.56 MHz reader sees the second. The employee therefore uses the same identifier at the gates of both generations.
The 125 kHz chip of the EM or Prox type gives a fixed number without authentication and without encryption. The 13.56 MHz chip under ISO/IEC 14443, for example DESFire EV3, offers AES 128-bit with mutual authentication. The transition period therefore has one weak point that must be planned: the 125 kHz gates remain as vulnerable as they were.
When planning the migration it is worth counting how many gates work on each frequency and keeping this list as a shared document of security, IT and the access control supplier. Without it the questions of the shift manager reach random people, and the answers are inconsistent.
Questions from the shift manager
The shift manager does not deal with technology, so the answers must be short and useful at the moment they are needed.
Why does this card work at gate A but not at gate B?
Most often because the two gates have readers of different generations, and the card is assigned to one chip layout. Check whether the right chip layout of the card is registered in the access control system for this gate.
What does the employee do when a gate does not read the card?
The employee goes to an entrance that accepts his card and reports the gate number to security. He must not ask for the card to be reprogrammed at the gate, because that is a task for the access control administrator.
Once all readers are replaced, does the card have to be replaced?
No, if the later generations of readers read the 13.56 MHz chip that is already in the card. The 125 kHz chip then goes unused, and once all gates ignore it, it can be switched off at system level.
Operating frequencies of the chips in the card (kHz)
Questions from security and IT
Security and IT need answers about the risk in the transition period and about when to close the old technology.
Is a dual-frequency card more secure?
Only at 13.56 MHz gates with authentication. At a 125 kHz gate it works like an ordinary Prox card: someone with a 125 kHz reader can read its number. Security depends on the gate, not on the card.
Can access rely on the UID alone during this period?
In low-risk zones, temporarily yes; in zones with higher risk, no. The UID on MIFARE Classic cards with a changeable UID can be rewritten, and 125 kHz cards carry a fixed number that is read without protection.
How to set the order of gate replacement?
Start with the zones where the entry of an unauthorized person has the greatest consequences. Internal doors with low risk come last.
The role of InnerWeb in the transition period
InnerWeb is a software manufacturer: it does not produce or replace access card readers and cards, but integrates with the client's existing access control system. The transition period does not require a change of integration: we receive the swipe event through a webhook from the access control system regardless of the frequency at which the card was read.
The value for the plant is that qualifications, permits and attendance keep working on one set of data, while some gates are already new and some are still old.
When the plant moves to a higher level of security, the supplementary system still sees the same stream of events, so permits and attendance reports do not have to be rebuilt after each stage of reader replacement.
Video
Frequently asked questions
Does a dual-frequency card replace reader replacement?
No. It eases the transition period, but security is provided only by a 13.56 MHz reader with authentication.
Does InnerWeb supply such cards?
No. Cards and readers are supplied by the access control supplier. InnerWeb integrates with that system and receives swipe events.
When can the 125 kHz chip be closed?
When no gate requires this frequency any more. Then the chip is switched off in the access control system, and the cards stay in use.
Sources
Keep continuity during card migration
Let us talk about how events from mixed gates can feed permits and attendance in one system.
Let's talk