Risk Catalogue Setup Cost: Time Calculation

In the sample below, a one-off setup of the risk catalogue for one hall takes about 31 hours of safety work. The payback comes after about 2.6 months at 80 permits per month. The figures are a sample calculation that you can replace with your own assumptions.

31 hrs
one-off setup of 60 risks
Source: sample calculation
2.6 months
payback at 80 permits per month
Source: sample calculation

What the setup cost consists of

The risk catalogue is hierarchical, and each risk has the required protective measures. Risks are assigned to locations at every level, that is hall, area, line and workstation, and to the type of high-risk work. The cost of setting up the catalogue is therefore mainly the time of the person who knows the hazards of the hall.

A single risk card has its name in Polish and English, a description, one pictogram, a list of preventive measures, and an assessment of probability, exposure and severity before and after the measures. There are no additional licence or equipment costs when entering the data: it is substantive work that the plant performs anyway when assessing occupational risk.

Important: the risk assessment is performed and approved by a person. The system does not assess risk automatically, which is why the time of the safety specialist is the main item of the calculation. The number of risks in the catalogue depends on the installation, so treat the figures below as a starting point for your own estimate.

Calculation assumptions

We assume one hall and a catalogue of 60 risks, including common risks, location risks and risks of work types. Each risk requires a description, choosing a pictogram, writing down the measures, and an assessment before and after the measures. We add the time for a second person to verify the catalogue.

All values are assumptions, not measurements. A plant with many well described risks in its existing risk assessment documentation will spend less time, because it can transfer ready content. A plant starting from zero will spend more.

  • 60 risks in the catalogue of one hall
  • 25 minutes per risk (description, pictogram, measures, assessment before and after)
  • 6 hours of verification and agreement with a second person
  • 80 permits per month for this hall
  • 12 minutes to add risks to a permit without the catalogue, 3 minutes with the catalogue

Time to add risks to one permit

Time to add risks to one permitTime to add risks to one permit: 12 minutes without the catalogue, 3 minutes with the catalogue02.557.51012.5minWithout catalogue: Per permit: 12 min12 minWithout catalogueWith catalogue: Per permit: 3 min3 minWith catalogue
Source: Sample calculation based on the assumptions in the calculation assumptions section

Result: one-off time

Entering 60 risks at 25 minutes each gives 1,500 minutes, or 25 hours. Adding 6 hours of verification gives 31 hours of safety work. For one person this is four working days spread over two weeks, without stopping current duties.

A risk entered once is from then on available to everyone: the administrator and the safety role create a new risk in the editor shared with the settings of high-risk work, and a missing hazard is entered one time. As a result the cost grows slowly, while the benefit covers every subsequent permit.

Payback on the first permits

Without the catalogue the issuer adds risks by hand: 12 minutes per permit. With the catalogue the issuer selects ready risks and adds only exceptions: 3 minutes. The saving is 9 minutes per permit, and at 80 permits per month that is 720 minutes, or 12 hours.

A 31 hour setup against a saving of 12 hours per month pays back after about 2.6 months. The quality gain matters more than the time gain here: risks on permits are consistent, in one language and with pictograms, and their list does not depend on who issues the document.

With more permits the payback shortens proportionally, and with fewer it lengthens. For 30 permits per month the saving is 4.5 hours, and the payback is about 7 months.

Cumulative hours saved at 80 permits per month

Cumulative hours saved at 80 permits per monthHours saved grow to 36 hours by the third month, exceeding the 31 hour setup cost020406080hrsMonth 1: 12 hrs12 hrsMonth 1Month 2: 24 hrs24 hrsMonth 2Month 3: 36 hrs36 hrsMonth 3Month 6: 72 hrs72 hrsMonth 6
Source: Sample calculation based on the assumptions in the calculation assumptions section

What the calculation does not cover

We do not include training time for users, because choosing risks in the permit wizard does not require a separate course. We also do not count savings on incidents avoided thanks to better information: such a number cannot be honestly predicted.

Indicative ranges from 2025 to 2026 implementations for the whole high-risk work module depend on scope and are priced individually. The time for setting up the catalogue is a cost on the plant's side, which is worth planning together with the implementation schedule.

Example calculation

Catalogue setup and payback time calculation

Assumptions
ParameterValue
Risks in the catalogue60 pcs
Time per risk25 min
Verification6 hrs
Permits80 per month
Saving per permit9 min

Result: One-off cost 31 hours, saving 12 hours per month, payback after about 2.6 months.

Note: Sample calculation based on the assumptions above; the plant's results depend on the number of risks and permits.

Video

Frequently asked questions

Does the catalogue setup cost have to be paid for each hall separately?

Risks are elements of one global catalogue, so a common risk is entered once. For further halls mainly the risks specific to their locations are added.

Will the system assess the risk by itself?

No. The documentation does not describe automatic risk assessment. The assessment is performed and approved by a person, and the system stores it and shows it on permits.

Who can add risks to the catalogue?

The administrator and the safety role create risks in the editor and assign them to types of high-risk work. Issuers can add a risk in the context of a specific permit.

How quickly do the savings appear?

From the first permits that use the catalogue. In the example, with 80 permits per month, the payback comes after about 2.6 months.

Calculate your own catalogue

We will provide a calculator with your numbers of risks and permits and show how quickly the catalogue starts to pay back.