InnerWeb
Skip to main content

Costs of QR badges for guests and contractors

With high guest turnover, the cost is decided not by the price of the carrier but by reception time and cards that are never returned. Below we compare a QR badge printed at the visit with a reusable plastic card, in a sample calculation with explicit assumptions.

-22,500 PLN
annual cost difference in the sample calculation
Source: kalkulacja przykładowa
-44%
lower cost of a visit with a QR badge
Source: kalkulacja przykładowa
15,000
visits a year in the assumptions
Source: kalkulacja przykładowa

What makes up the cost of a single guest visit?

The cost of a visit is not the price of the carrier but the sum of three items: the carrier itself, the time of the person at reception who issues and takes it back, and losses, meaning cards that do not come back. With a reusable card there is also the task of checking the return, because a guest who leaves without returning the card leaves a gap in the records.

A QR badge changes this structure: the carrier costs pennies, there is no return, and issuing takes less time because the account and the printout are created in one action.

  • Carrier: a plastic card, or a label or badge with a QR code.
  • Reception time: issuing, and with a card also the return and the check.
  • Losses: cards not returned and damaged cards.
  • Equipment: a label printer and paper, bought once and not for each visit.

How does reception issue a QR badge in one action?

The reception tile turns the guest's first and last name into an external account with an employee number and a printed QR badge in one action. The receptionist does not create the account separately and then look for a way to print it in another tool.

When the visit was planned in advance, the invitation carries a QR code, so the guest can show it on a phone, and a printout is needed only if the site requires a badge visible on clothing. The message with the personal code reaches the person only after the gate lets them through in terms of training.

Annual cost of guest handling: card versus QR badge

Annual cost of guest handling: card versus QR badgeBefore and after chart: plastic card 6,000 PLN for carriers and 45,000 PLN for reception time, QR badge 6,000 PLN for carriers and 22,500 PLN for reception time010,00020,00030,00040,00050,000PLNPlastic card (Carriers and losses): 6000 PLN6000 PLNQR badge (Carriers and losses): 6000 PLN6000 PLNCarriers and lossesPlastic card (Reception time): 45,000 PLN45,000 PLNQR badge (Reception time): 22,500 PLN22,500 PLNReception time
  • Plastic card
  • QR badge
Source: Sample calculation based on the assumptions in the calculation section

Sample calculation: 60 guests and contractors per day

We assume a site with a reception that handles 60 visits a day over 250 working days, that is 15,000 visits a year. All prices and times are assumptions to be replaced with your own values.

Variant with a reusable plastic card

The card costs 8 PLN, and 5% of visits end with a card that is not returned or is destroyed, which is 750 cards a year, giving 6,000 PLN. Issuing takes 2 minutes and the return with a check 1 minute, in total 3 minutes at 1 PLN per minute, which is 3 PLN per visit. Handling costs 15,000 times 3 PLN, which is 45,000 PLN. Total 51,000 PLN per year.

Variant with a QR badge printed at the visit

A printed label or badge costs 0.40 PLN by assumption, so the carriers come to 15,000 times 0.40 PLN, which is 6,000 PLN. Issuing from the reception tile takes 1.5 minutes and there is no return: 15,000 times 1.50 PLN gives 22,500 PLN. Total 28,500 PLN per year.

The difference is 22,500 PLN per year, about 44% of the cost of the card variant. Almost all of the saving comes from reception time, not from the price of the carrier.

What does the calculation not include, and when does a card still make sense?

The calculation does not include the purchase of a label printer, which is a one-off cost, or the time of a guest host. It also does not include the risk that someone hands a badge to another person: for this reason, for a planned visit it is important to assign a host and check a photo or a document where the procedure requires it.

A reusable card keeps its sense where the site by rule issues physical carriers, for example in zones where the reader accepts only a card. In that case the card for the guest is issued by the KD system, and our software receives the events from it. InnerWeb does not manufacture readers or cards.

Planned visit and contractor: does the cost look the same?

A planned visit replaces the requirement for a one-day permit for people entering without work, but training, qualifications and an active account still decide on entry. A contractor doing hazardous work needs a permit and qualifications, so the cost of their entry also includes the time spent on formalities, which does not depend on the type of carrier.

For this reason the saving from QR badges is best measured on guests without work and on returning contractors, for whom an account from a previous visit shortens the task at reception.

Example calculation

Annual cost of guest handling: plastic card versus QR badge

Assumptions
ParameterValue
Visits per day60 guests and contractors
Working days250 days a year
Reusable card8 PLN; 5% not returned
QR badge printout0.40 PLN per visit
Card time: issuing plus return3 min at 1 PLN/min
QR badge time1.5 min at 1 PLN/min

Result: Plastic card: 51,000 PLN per year. QR badge: 28,500 PLN per year. Difference 22,500 PLN per year.

Note: Sample calculation. Prices and times are assumptions to be replaced with your own values; it does not include the purchase of a label printer or the time of a host.

Checklist

Video

Frequently asked questions

Does a QR badge replace the induction training?

No. Training, qualifications and an active account still decide on entry; the badge is only a carrier of identity.

What happens when a guest loses the badge?

Reception cancels the badge and the system issues a new one. The badge history stays.

Does every guest need a printout?

No. For a planned visit the QR code can be on the phone, and a printout is needed only if the site requires a badge visible on clothing.

Does the calculation fit every site?

No, it is an example on explicit assumptions. Put in your own number of visits, reception time and carrier prices.

Let's work out reception on your data

Book a call: we will show issuing a badge in one action and put your visits and times into the calculation.

Let's talk