Cost of scaling licences and transmitters with the number of sites

An operator that starts with one area and adds further sites wants to know how the unit cost changes. The price list scales with volume: a server with 10 licences costs PLN 800, one with 100 licences PLN 4,000 net per month, and the rate per transmitter falls from PLN 7 to PLN 3.5. Below is the calculation per employee and per transmitter.

-50%
licence cost per employee when moving from 10 to 100 licences
Source: kalkulacja przykladowa
PLN 3.5
transmitter rate above 6,000 units
Source: karta
95
sites on one platform in the municipal project
Source: karta

Licence price thresholds for the server

The sample price list is based on three thresholds: a server with 10 licences at PLN 800, with 50 licences at PLN 2,500 and with 100 licences at PLN 4,000 net per month. A licence is assigned to a system user, so the cost grows with the number of people covered by protection and using the panel.

The amounts are indicative price ranges from deployments in 2025-2026; an individual quote depends on scope and integrations. More important than the amount is the shape of the curve: the price grows more slowly than the number of licences, so every additional site joined to a shared server lowers the average cost per person.

Monthly licence cost per employee

The calculation is simple. With 10 licences, the cost per licence is PLN 800 divided by 10, or PLN 80 per month. With 50 licences, PLN 2,500 gives PLN 50 per licence. With 100 licences, PLN 4,000 gives PLN 40 per licence.

Moving from 10 to 100 licences increases the total cost fivefold (from PLN 800 to PLN 4,000), while the number of licences grows tenfold. The cost per licence therefore falls by half, from PLN 80 to PLN 40. For the procurement department this is an argument for planning one platform for many sites rather than separate deployments for each of them.

Licence cost per employee by threshold

Licence cost per employee by thresholdBar chart: the licence cost per employee is PLN 80 with 10 licences, PLN 50 with 50 and PLN 40 with 100.020406080PLN per month per licence10 licences: 80 PLN per month per licence8010 licences50 licences: 50 PLN per month per licence5050 licences100 licences: 40 PLN per month per licence40100 licences
Source: Sample calculation: server price divided by the number of licences

Transmitter lease: the rate falls with volume

Transmitters are leased monthly. The rate is PLN 7 per unit up to 500 units and PLN 3.5 above 6,000. Intermediate bands are set in an individual quote, so the sample calculation limits itself to the points known from the price list.

The maintenance subscription covers replacing the transmitter batteries about every 4 years as part of the service, so the lease does not carry a separate service cost in the following years. In the example with 200 transmitters, the service costs PLN 7 per unit per month, or PLN 1,400 per month in total.

How many transmitters a site needs

Placement is a design rule: plant roads about every 100 m, and inside buildings one transmitter per 100-200 m2. The position is calculated from the signals of several transmitters averaged on the map, and it works without GPS. In the offer, typically 100 units for PLN 700 net per month, that is PLN 7 per unit, cover about 20,000 m2, on average one transmitter per 200 m2.

Scale of a multi-site project

In a municipal project one platform serves 95 sites of different geometry: over 120,000 m2, 11,000 transmitters and an accuracy below 1.5 m. A shared platform with a separate configuration for each site made it possible to keep one server instead of many. This is the best illustration of the principle that the unit cost falls with volume.

With 11,000 transmitters, the rate above 6,000 units is PLN 3.5. If, for simplicity, this rate is assumed to apply to the whole number, the monthly lease cost is PLN 38,500, or on average PLN 3.5 per unit. This is an assumption of the sample calculation, not an offer: the actual intermediate bands depend on the quote.

Transmitter lease rate

Transmitter lease rateBar chart: the transmitter lease costs PLN 7 per month up to 500 units and PLN 3.5 above 6,000 units.02468PLN per month per unitUp to 500 units: 7 PLN per month per unit7Up to 500 unitsAbove 6,000 units: 3.5 PLN per month per unit3.5Above 6,000 units
Source: Field card: price list scaled by volume

Two examples: a small site and a multi-site operator

Small site: 10 licences (PLN 800) and 200 transmitters at PLN 7 (PLN 1,400) come to PLN 2,200 per month, or PLN 220 per employee and PLN 11 per transmitter. Multi-site operator: 100 licences (PLN 4,000) and 500 transmitters at PLN 7 (PLN 3,500) come to PLN 7,500 per month, or PLN 75 per employee and PLN 15 per transmitter in this example.

Per employee the cost falls more than twofold, while per transmitter it rises, because the operator has more people per fewer transmitters. The difference shows that it is worth calculating both indicators separately: the first depends on the number of licences, the second on the geometry of the sites.

Example calculation

Sample calculation: small site and multi-site operator

Assumptions
ParameterValue
Small site: licences10 licences (PLN 800)
Small site: transmitters200 units at PLN 7
Operator: licences100 licences (PLN 4,000)
Operator: transmitters500 units at PLN 7

Result: Small site: PLN 2,200 per month, PLN 220 per employee. Operator: PLN 7,500 per month, PLN 75 per employee.

Note: Sample calculation; indicative price ranges from deployments in 2025-2026; individual quote. Intermediate transmitter rates are set by the quote.

Checklist

Video

Frequently asked questions

Does every additional site require a new server?

No. In the municipal project one platform serves 95 sites, and each has its own configuration. As a result, the cost per licence falls with volume.

Does the lease include replacing the transmitter batteries?

Yes. The maintenance subscription covers replacing the batteries about every 4 years as part of the service, with no separate cost item.

Are the rates on this page an offer?

No. They are indicative price ranges from deployments in 2025-2026, and the quote is individual. The calculation is meant to show the shape of the cost curve.

We will calculate scaling for your sites

Book a call about the number of licences and transmitters on further sites. We will calculate the cost per employee and per transmitter on your data.

Let's talk