What makes up the cost of one area
The sample offer for one area includes a one-off implementation at PLN 4,200 net and maintenance at PLN 1,850 net per month. The scope covers 50 transmitters, 4 watches with LTE connectivity and 10 users. This is a set in which the area has signal coverage, a few people work in the field with watches, and the other users work with the panel and notifications.
The amounts are indicative price ranges from deployments in 2025-2026. An individual quote depends on the surface area, the number of people and the integration requirements. The procurement department should treat them as a starting point for a conversation, not as a price list.
- one-off implementation: PLN 4,200 net
- maintenance: PLN 1,850 net per month
- scope of the example: 50 transmitters, 4 LTE watches, 10 users
Converting the subscription to a daily cost
Maintenance of PLN 1,850 per month comes to PLN 22,200 per year. Divided by 365 days, that is about PLN 60.8, or about PLN 61 per day. This result matches the figure in the offer and covers the subscription alone, without the one-off implementation cost.
To compare the full cost, the implementation is spread over the assumed period of use. Over 36 months (1,095 days), PLN 4,200 divided by 1,095 gives about PLN 3.8 per day. In total the example therefore costs about PLN 64.7 per day for one area. With a different billing period the result changes slightly, because the subscription dominates.
Daily cost of one area: manual supervision versus the system
Comparison with manual supervision
Manual supervision means a person who watches the area continuously or makes periodic rounds. For a fair comparison, an assumption about the cost of an hour of work has to be made. The sample calculation assumes PLN 55 per hour of one person's work and one person staffing the area for 24 hours, which gives PLN 1,320 per day.
Setting PLN 1,320 against about PLN 64.7 is a difference of more than twentyfold. This does not mean the system replaces the person: the dispatcher and the people responding remain. What it shows is the scale of the cost of constant supervision that the system replaces in the function of continuous observation, leaving people to respond to the alarm.
What the calculation leaves out
The example does not include the costs of responding to an alarm, training people or the infrastructure on the site side. It also does not include the variable time of rounds. Each of these items depends on the site, so the procurement department should add them to its own worksheet before deciding.
Cost per user and per watch
With 10 users, the PLN 1,850 subscription comes to PLN 185 per month per user. With 4 LTE watches, that is about PLN 462.5 per month per watch, if the whole cost is assigned to the devices. Both figures are convenient for departments that allocate costs per person or per device.
The subscription also covers replacing the transmitter batteries about every 4 years as part of the service. In the example with 200 transmitters, this costs PLN 7 per unit per month. For the calculation of one area, this means the battery is not a separate budget item in the following years.
How to use the calculation in a purchase justification
One table is enough for a justification: the daily cost of the system, the daily cost of the alternative and the assumptions on which both values are based. The procurement department replaces the assumed hourly cost of work with the value for its own site, and the number of people and hours follows from the current work organisation.
The duty to ensure safe working conditions arises from art. 207 of the Polish Labour Code (Kodeks pracy). The system provides evidence for an audit, not a guarantee of compliance, so in a justification it is described as a tool that supports meeting that duty.
Sample calculation: daily cost of one area
| Parameter | Value |
|---|---|
| One-off implementation | 4,200 PLN net |
| Maintenance | 1,850 PLN net per month |
| Billing period of the implementation | 36 months |
| Cost of an hour of manual supervision | 55 PLN (sample assumption) |
| Manual staffing (1 person) | 24 hours per day |
Result: System: about PLN 60.8 of subscription plus about PLN 3.8 of implementation, in total about PLN 64.7 per day. Manual supervision: PLN 1,320 per day.
Note: Sample calculation; indicative price ranges from deployments in 2025-2026; individual quote. Does not include the costs of response or training.
Checklist
Video
Frequently asked questions
Does PLN 61 per day include the implementation?
No. That figure is the maintenance subscription alone, converted to a daily amount. The PLN 4,200 implementation spread over 36 months adds about PLN 3.8 per day.
Does the system replace a person on duty?
It replaces the function of continuous observation of the area. The dispatcher and the people responding remain, because someone has to respond to the alarm and close it.
Where does the PLN 55 per hour assumption come from?
It is a sample assumption for comparison, not a figure from a card or an external source. Procurement should enter its own rate.
We will calculate the area on your assumptions
Book a call with procurement. We will turn the sample calculation into the numbers of your area, rates and number of people.
Let's talk