What makes up the cost of a reminder campaign?
The campaign cost is the sum of two variable items: the number of SMS segments multiplied by the segment price charged by the gateway operator, and the number and length of voice calls from the exchange. The fixed item is keeping the gateway and lines running, which the plant has regardless of training.
For purchasing the distinction matters: the unit price comes from the contract with the operator, and the number of units comes from how the message is configured. The plant has a real influence on the second item.
When does segmentation double the bill?
An SMS in the 7-bit GSM 03.38 encoding fits 160 characters in one segment, and in the 8-bit encoding only 70. A single Polish diacritic letter would switch the whole message to the 70-character encoding, so the text is transliterated into the GSM alphabet.
The financial consequence is simple. A 150-character message with Polish letters would take three segments instead of one, because for longer messages the segment limit is lower than for a single SMS. Transliteration keeps it in one segment.
A message longer than one segment leaves a warning in the log instead of quietly multiplying the cost. Purchasing can therefore review the log and find templates that need shortening.
What to shorten first
Unnecessary introductions, repeated plant names and long links. The activation message uses a short link with a 16-character token, which leads to the same screen as the long link from the e-mail.
SMS segments for 60 recipients: with Polish letters and after transliteration
How long does a phone call with a message take and what does it cost?
The dialer calls one number at a time, and a single call with a speech synthesiser lasts roughly 25 to 33 seconds. The calculation uses the upper value, because it sets the working time of the exchange and the limit per slot.
The per-slot limit caps the number of calls, so the run does not exceed the time limit of the automat. For purchasing this means the cost of calls is predictable: the run has a hard ceiling.
Sample calculation for 60 contractors
The assumptions below are illustrative and do not describe any specific plant. The plant enters the unit prices from its own contract with the operator.
The result shows that the difference between an SMS in one segment and one in three segments is a multiple of the base cost at this scale, although in absolute numbers the campaign is cheap. The saving comes from discipline in the content, not from giving up the channel.
How to limit the cost without losing effectiveness?
The first call goes out no earlier than one day after the invitation, and there are at most three attempts. This limit also protects the budget: the campaign does not keep calling a person who does not respond.
It is worth reviewing the log after each campaign, removing people without a phone number from the lists, and making sure the templates fit into one segment.
- SMS template within one segment (up to 160 GSM characters)
- review of segment warnings in the log after each campaign
- phone attempt limit: three at most
- check the unit prices in the operator contract every year
Reminder campaign for 60 contractors
| Parameter | Value |
|---|---|
| Recipients with a phone number | 60 people |
| Message with Polish letters (longer, with a link) | 3 segments per SMS |
| The same message after transliteration to GSM | 1 segment per SMS |
| Duration of one call (upper value) | 33 seconds |
| Recipients called (half did not open the link) | 30 people |
Result: SMS: 180 segments with Polish letters versus 60 after transliteration, which is three times fewer. Calls: 30 calls of 33 s each is about 16.5 minutes of total exchange time per round.
Note: Sample calculation on illustrative assumptions. Unit prices come from the plant's contract with the operator; indicative ranges from 2025-2026 deployments; individual quotation.
Video
Frequently asked questions
Does the system shorten overly long SMS messages itself?
The text is transliterated to GSM 03.38, and a message longer than one segment leaves a warning in the log. Shortening a template is the administrator's decision.
Can phone calls generate unlimited cost?
No. The per-slot limit caps the number of calls, and there are at most three attempts.
Does the callback also cover the plant's own employees?
No. The callback covers only external companies, and the plant reminds its own employees itself.
Where do the unit prices for the calculation come from?
From the plant's contract with the SMS gateway operator and the exchange. The example on this page uses illustrative assumptions only.
Want to calculate a campaign for your contractors?
Give us the number of external companies and we will prepare a calculation with your unit prices.
Let's talk