InnerWeb
Skip to main content

Grouped alarm instead of single alerts at the gate

When a dozen scans of people without valid training arrive at the gate within an hour, a separate alert for each scan floods the coordinators of the external company. A grouped alarm with a 55-minute aggregation window turns the flood into one message. Below is a sample calculation of what this removes.

55 min
aggregation window of the grouped alarm
Source: karta
36 to 3
notifications in a peak hour (12 people, 3 channels)
Source: kalkulacja przykladowa
12 to 1
phone calls in this scenario
Source: kalkulacja przykladowa

How does the grouped alarm work?

The no-training alarm at the gate is grouped per external company. The aggregation window is 55 minutes, and a repeat notification for the same company is sent no sooner than after 55 minutes. During that time, further scans of people without training from the same company do not generate new messages.

For the coordinator this means one message saying that people from their company were stopped at the gate, instead of a series of identical alerts that stop being read after the third one.

Who receives the notification and through which channel?

The no-training notification goes to the coordinators of the external company by phone, e-mail and through the team messenger. Three channels at once increase the chance that someone reacts in time, while people are standing in front of the gate.

The aggregation applies to the number of messages, not to the number of channels. Each 55-minute window produces one message in each of the three channels, not a dozen.

Number of notifications in a peak hour (12 people without training)

Number of notifications in a peak hour (12 people without training)Before and after chart: 36 single notifications versus 3 in the grouped alarm.010203040notificationsSingle notifications: All channels: 36 notifications36Single notificationsGrouped alarm: All channels: 3 notifications3Grouped alarm
Source: Sample calculation based on the assumptions in the Calculation section

What does the aggregation window remove?

It removes three kinds of load. On the external company's side: the number of messages to read and to ignore. On the exchange side: the number of outgoing calls, each lasting roughly 25-33 seconds. On the records side: the number of entries to review during an audit.

A phone call with a speech synthesiser occupies the exchange, because the dialer calls one at a time. Ten single alarms mean ten calls one after another, while one grouped alarm means one call.

Why exactly 55 minutes

The window is shorter than an hour, so with a continuing problem at the gate the coordinator gets a reminder about once per working hour, and not less often. The value comes from the function configuration, not from a legal regulation.

Sample calculation: peak hour at the gate

Assume a peak hour in which 12 people without valid training from one external company were stopped at the gate. The assumptions are illustrative.

Without aggregation the coordinator would get 12 messages in three channels, that is 36 notifications, and the exchange would make 12 calls. With the 55-minute window: 3 notifications and one call. A reduction to one twelfth.

Exchange phone calls in a peak hour

Exchange phone calls in a peak hourBar chart: 12 calls with single notifications and 1 with the grouped alarm.02.557.51012.5callsSingle: 12 calls12 callsSingleGrouped: 1 calls1 callsGrouped
Source: Sample calculation based on the assumptions in the Calculation section

What to watch for during implementation?

The grouped alarm must state how many people are affected and which company they belong to, otherwise the coordinator cannot judge the scale. It is also worth establishing who the coordinator is in the external company, because without an assignment the notification has no addressee.

The aggregation window does not replace the gate security decision. A person without training still does not enter, and the alarm serves to shorten the time the company needs to arrange training.

  • an assigned coordinator for each external company
  • a verified phone number for the coordinator
  • the team messenger connected to the channel
  • a 55-minute window that is understood by security and coordinators
Example calculation

Peak hour at the gate, one external company

Assumptions
ParameterValue
People without valid training stopped in the hour12 people
Coordinator notification channels3 channels
Aggregation window55 minutes
Duration of one call (upper value)33 seconds

Result: Without aggregation: 36 notifications and 12 calls, which is about 6.6 minutes of exchange occupancy. With the 55-minute window: 3 notifications and 1 call, about 33 seconds.

Note: Sample calculation on illustrative assumptions; it does not describe a specific plant. The number of people in a peak hour depends on how the contractors organise their work.

Video

Frequently asked questions

Does the grouped alarm delay the first notification?

The aggregation window limits repeat notifications for the same company to one per 55 minutes. The description of the function does not provide for delaying the first notification.

Does aggregation apply to all companies together?

No. The alarm is grouped per external company, so each company has its own window.

Who receives the alarm?

The coordinators of the external company, by phone, e-mail and through the team messenger.

Will a person without training get in despite the alarm?

No. The alarm informs the company, and the decision on entry depends on the admission rules and gate security.

Is the gate flooding you with alerts?

Book a meeting with InnerWeb. We will calculate the load on coordinators and the exchange for your gate.

Let's talk