Where waiting at the gate comes from
An external service technician arrives for an agreed visit, but the host is in the production zone, in a meeting, or does not know that the guest is already waiting at the gate. The gate will not let them in without the required conditions being met, and the host has no way of learning that someone is waiting for them. The crew stands by while the hourly rate keeps running.
In the system every visit has a host, meaning an active internal employee. When a guest first enters on the day of the visit, the dispatcher calls the host once, without retries. This way the information reaches the right person at the moment the guest appears, not when someone happens to notice them.
Dispatcher call and group call
The calling rules are designed so that the host is not flooded with calls and guests do not wait longer than necessary.
One call at the first entry
The call to the host goes out once, at the guest's first entry on the day of the visit. A host without a phone number receives one e-mail instead of a call, provided they have an e-mail address, and the missing number does not use up a call attempt. In practice this means the plant should have the host phone numbers filled in, because the e-mail is a substitute solution.
Group call for several guests
Further guests of the same host within 3 minutes do not trigger separate calls. After 30 seconds of silence one group call goes out, and 3 minutes without movement reset the group. For a service crew of several people arriving at the gate one after another, the host therefore receives one call instead of several.
Cost of a 3-person crew waiting on one visit
Sample calculation: waiting at the gate
The assumptions are examples and do not describe any specific plant or service company. Each plant should substitute its own rates and times from recent visits, for example from the entry log.
The crew consists of 3 technicians, and the hourly cost of one person for the service company is PLN 180, so the crew costs PLN 540 per hour, that is PLN 9 per minute. Without a notification system the average waiting for the host is assumed to be 25 minutes, which gives PLN 225 per visit. With the dispatcher call the waiting is reduced to 8 minutes, that is PLN 72. The saving per visit is 17 minutes and PLN 153.
With 12 service visits a week and 50 weeks a year, this gives 600 visits a year. The saving is 10 200 minutes, that is 170 crew hours, and PLN 91 800 a year. The cost is usually borne by the service company, but it returns to the plant in service prices and in maintenance schedules.
Effect of the group call
When four guests of the same host arrive at the gate within 3 minutes, the system makes one call instead of four. Assuming 2 minutes of dispatcher work per call, this is 6 minutes less per group, and the host is interrupted once. This effect is harder to price in zlotys, but in a plant where the host works in the clean zone, every interruption has its cost.
How to confirm the calculation
First measure the current state: for two weeks record the time from the crew's arrival at the gate until the host appears. Then complete the host phone numbers and decide who is the substitute host during holidays. Visits can be planned up to 377 days ahead, at most 34 days at a time, and a day with an existing visit is skipped, while another person's host is not overwritten. This allows hosts to be entered in advance for recurring inspections of qualified equipment.
Sample calculation: service crew waiting
| Parameter | Value |
|---|---|
| Technicians in the crew | 3 people |
| Hourly cost of one person | 180 PLN |
| Waiting without the dispatcher call | 25 min |
| Waiting with the dispatcher call | 8 min |
| Service visits | 12 per week |
| Weeks in the year | 50 weeks |
Result: The crew costs PLN 9 per minute: waiting PLN 225 without the call and PLN 72 with it, that is PLN 153 per visit; with 600 visits a year, PLN 91 800 and 170 crew hours.
Note: Sample calculation. Times and rates are assumptions that the plant replaces with its own measurements; the result does not apply to any specific service company.
Video
Frequently asked questions
How many times does the dispatcher call the host?
Once, at the guest's first entry on the day of the visit, without retries. Further guests within 3 minutes are covered by one group call.
What if the host has no phone number?
The host receives one e-mail instead of a call, provided they have an e-mail address. The missing number does not use up a call attempt.
Can a visit be planned in advance?
Yes, from today up to 377 days ahead, at most 34 days at a time. A day with an existing visit is skipped, and another person's host is not overwritten.
Let's count the waiting of your service team