InnerWeb
Skip to main content

Cost of QR badge printing: manual requests versus a print request from the invitation

A day with several hundred guests, for example an open day or a client audit, turns the secretariat into a printing point. The question is whether a print request generated from the invitation and printing without clicks shorten that work. We answer with a sample calculation on open assumptions, taking into account what the system does on its own and what stays with a person.

200 min
manual printing of 300 labels (sample calculation)
Source: sample calculation
36 min
with a request and sheets of up to 144 labels
Source: sample calculation
144
identifiers in one print job
Source: karta

How manual label printing works

Without a print request the host writes an email to the secretariat or phones, and the secretary copies the list of names into the system and starts the print. Every visit is a separate piece of correspondence, and every typing error in a surname is a correction. With ten guests a day this is tiresome, with several hundred in one day it becomes a bottleneck, because the secretariat has no way to speed up manual copying.

The hidden cost is also the queue of guests at the entrance when the labels are not ready, and the time of hosts who wait in the lobby. These costs do not appear on an invoice, but the plant pays them in unused working time.

Print request from the invitation: what the secretariat receives

In the invitation windows a field called Send label print request appears, but only when the administrator has set the secretariat address. The email contains the guest, the visit date, the host and a Print button. The secretary does not copy anything: she opens the message and clicks the button.

In a group invitation the request is sent only after the guests have registered. If registration is partial, the system waits up to 8 hours, checks the queue every 5 minutes and gives up after 13 days. This way the secretariat does not receive requests that cannot yet be answered with a print.

Secretariat work with 300 guests in one day

Secretariat work with 300 guests in one dayBefore and after chart: 200 minutes of manual work, about 36 minutes with a print request.050100150200minManual requests: Work time: 200 min200 minManual requestsRequest and sheet: Work time: 36 min36 minRequest and sheet
Source: Sample calculation based on the assumptions in the Sample calculation section

Printing without clicks: conditions and limits

A label on a DYMO printer prints by itself when three conditions are met: the DYMO Connect service responds, a LabelWriter printer is connected and the logo has been loaded. The card closes after 2 seconds. The parameter auto=0 forces a preview only, which is useful at a training station or when checking the layout of a label.

The secretariat should know that when one of the conditions is not met, automatic printing does not start and the preview has to be used. The most common cause is the DYMO Connect service being switched off on the secretariat computer. Add a check of this service to the morning checklist.

Sample calculation: a day with 300 guests

Sample assumptions: 300 guests in one day, 40 seconds of secretariat work per label with manual copying and email request, 6 seconds per label when printing from a sheet on the print page. The print page accepts up to 144 identifiers in one request, so 300 guests make 3 sheets: 144, 144 and 12 labels.

Manually: 300 times 40 seconds is 12,000 seconds, that is 200 minutes. With a request and a sheet: 300 times 6 seconds is 1,800 seconds, that is 30 minutes, plus about 6 minutes for three requests and checking the sheets. Together about 36 minutes. The saving is about 164 minutes, that is more than 2.5 hours of secretariat work on that one day.

What is not in the calculation

The calculation does not include the cost of the label printer, consumables or the time of the rollout. The plant buys and integrates the hardware, because InnerWeb is a software producer. Indicative price ranges from 2025-2026 rollouts; individual quote.

It also does not include guests who did not register in advance. For them the print takes place at the station, one by one. That is why it is worth directing guests to register before the visit and showing hosts that the Print QR code list shows people with training activity in the last 13 days who have never had an identifier printed.

Example calculation

Printing 300 QR labels in one day

Assumptions
ParameterValue
Guests in the day300 people
Manual time per label40 s
Sheet time per label6 s
Labels per sheet144 max
Time for requests and checks6 min

Result: Manual: 200 min. With a request: about 36 min. Saving about 164 min, more than 2.5 hours.

Note: Sample calculation. Cost of hardware and rollout: indicative price ranges from 2025-2026 rollouts; individual quote.

Video

Frequently asked questions

Will the secretariat receive a request before the guests have registered?

Not for a group invitation. The request waits for registration for up to 8 hours, the queue is checked every 5 minutes, and after 13 days the system gives up.

What to do when automatic printing does not start?

Check the DYMO Connect service, the connection of the LabelWriter printer and the loaded logo. The parameter auto=0 lets you open the preview itself.

Can I print for a group larger than 144 people?

One request covers up to 144 identifiers, so you split a larger group into consecutive sheets.

Let us measure label printing in your secretariat

Book a call. We will measure the time per label in the current process and show the result with a print request on your sample day.

Let's talk