InnerWeb
Skip to main content

Guest badge with a QR code: best practices for printing labels

The secretariat is best off printing QR labels from a single list, from which a person disappears once printed, rather than from emails and notes. Below are six practices that protect against double printing and a blocked queue at the entrance: the To print list, automatic printing, a batch sheet and the Printed marker.

89
maximum number of items on the To print list
Source: internal card
13 dni
training activity window of the To print list
Source: internal card
34 s
refresh interval of the To print list
Source: internal card

Why label printing needs rules

The guest badge is the only thing a guest holds at the gate, so its absence stops the entry. The secretariat handles several sources of orders at once: invitations from hosts, groups of contractors, people who arrive without notice. Without rules two errors appear: a duplicated print and a missed print.

The system solves both errors with mechanisms, but their effectiveness depends on the habits of the secretariat. Below we describe the practices that work in production plants with a label printer at the entrance.

Printing practices

The practices are ordered by the sequence of work: from the list of orders to the check after printing.

Practice 1: work from the To print QR code list

The list shows people with training activity in the last 13 days who have never been issued a badge. It refreshes every 34 seconds and returns at most 89 items. If the list is longer, print in batches and come back to it after the refresh.

Practice 2: trust the Printed marker

After a label is printed, the person disappears from the list. Until the refresh, the row is greyed out with the Printed marker, so that the operator does not print twice. Do not click a second time even if the printout seems invisible: check the printer first.

Practice 3: let the label print automatically

A label on the label printer prints by itself when the print service responds, a printer is connected and the logo has loaded. The card closes after 2 seconds. The parameter auto=0 forces a preview only, which is useful during a test or when the layout must be checked before printing.

Practice 4: print many guests as a sheet

The print page accepts up to 144 badges. For one label it offers a choice of size, and for many it lays out a sheet. On an open day one batch print replaces a series of single clicks and does not block the queue at the entrance.

Practice 5: print before the guests arrive

For a group invitation the order reaches the secretariat only after the guests have registered. When part of the group has registered, the system waits up to 8 hours and checks the queue every 5 minutes. Print the labels in the morning of the visit, not at the moment the group is standing at the gate.

Practice 6: tick the health declaration before printing

When the plant requires a health declaration (a BRC requirement), reception ticks before printing that the person has made the declaration verbally. A scan without the declaration returns the status declaration required, with no gate entry and no addition to the group.

Limits of the QR label printing process

Limits of the QR label printing processChart: 144 badges on a sheet, 89 items on the list, refresh every 34 seconds.050100150valueBadges on a sheetBadges on a sheet: 144 value144Items on the To print listItems on the To print list: 89 value89List refresh (s)List refresh (s): 34 value34
Source: Documentation of the registration station and the label print order

Mistakes that repeat across plants

The first mistake is printing from email instead of from the list: the operator cannot see that someone has already printed the label. The second is forcing a print when the printer does not respond, which ends with a duplicated queue after it is restarted. The third is a lack of roll stock, which shows up at the first larger order.

The fourth mistake concerns readability: a label with a blurred code will not pass the USB HID scanner at the station. We recommend a test print and a control scan after changing the roll or the quality settings.

How to measure the quality of the print process

Track two indicators: the number of people on the To print list at the start of a shift, and the number of repeat prints of the same person. The first shows the backlog, the second the habits of the operators. Both can be read from the list and from the badge history without additional tools.

Checklist

Video

Frequently asked questions

What do I do when the To print list has more than 89 people?

The list returns at most 89 items. Print the first batch and wait for the refresh, which happens every 34 seconds.

Can I force only a preview of the label?

Yes. The parameter auto=0 in the card address shows the preview only, without automatic printing.

How do I know that a person already has a badge?

After printing, the person disappears from the list, and until the refresh their row is greyed out with the Printed marker.

Let's organise badge printing at the secretariat

Let's talk about printing QR labels for guests and contractors. We will show the To print list and batch printing in a demonstration.

Let's talk