Turnaround at a Chemical Plant: Coordinating 200 Contractors

A chemical plant in an international group, an NIS2 essential entity, serves about 20 external maintenance firms day to day. During a turnaround the number of firms grows by an order of magnitude, so what worked at the gate stops being enough. This generic case shows the path: training before arrival, a digital permit, a check in the field.

ca. 20
external firms in daily maintenance
6 wks
time to launch at the plant from the cards
900 h
of training moved before arrival (200 firms)
Source: example calculation

Situation: a chemical plant and a jump in the number of firms

This is a generic case: a chemical plant (refining and petrochemicals in an international group) that falls under the rules on preventing major accidents and is an NIS2 essential entity. About 20 external firms work here in daily maintenance, and up to 10 people on the plant side use the system.

A turnaround changes the scale. For this example we assume 200 external firms in the shutdown window. This is a scenario assumption, not implementation data: the data from the cards concerns a plant with 20 firms, and the calculation for 200 firms is an illustrative calculation.

Problem: training at the gate and paper permits

With about 20 firms, the plant admits several dozen non-employees to work every month, often for hot work, work at height and in tanks. Permits live in binders, and there is no current picture of open jobs. Induction training takes place at the gate and delays the start of work.

It is also hard to confirm that every person on the crew completed the training, not only the foreman. The validity of qualifications (electrical, pressure equipment, work at height) is tracked by hand. On paper the sequence of safeguards, measurements and signatures is not enforced. During a turnaround each of these weaknesses is multiplied by the number of firms.

External firms: daily operation and turnaround

External firms: daily operation and turnaroundBar chart: 20 external firms day to day versus 200 firms in the turnaround scenario.050100150200firmsDaily maintenance (card): 20 firms20 firmsDaily maintenance (card)Turnaround (scenario): 200 firms200 firmsTurnaround (scenario)
Source: (about 20 firms) and the scenario assumption of 200 firms

Solution: one path from training to inspection

The plant launches one path: training, permit, inspection. A named invitation with a QR code reaches the contractor's employee by e-mail or SMS. Online training ends with a test of randomly drawn questions and a declaration in two language versions. The register of firms and qualifications has expiry dates and reminders, and the system does not admit a person without current training.

A digital permit is created in a dozen or so seconds, goes through approvals and is printed as a PDF in one of two plant templates. Particularly hazardous work types (hot work, work at height, confined spaces, work on power equipment) have their own safeguard lists, and authorisation matrices control who may issue and approve a permit. In the field, scanning a person's QR code shows training, qualifications and today's permit.

  • Online training before arrival, in two language versions
  • A test of random questions and a declaration
  • Register of firms with expiry dates and reminders
  • Permits in two plant templates, PDF print-out
  • QR code inspection in the field

Illustrative calculation: 200 firms and training hours

Assumptions of the illustrative calculation: 200 firms, an average of 6 people per firm, online training of 45 minutes per person, 12 working days of turnaround and one permit per firm per day. This gives 1,200 people to train, that is 900 training hours, and 2,400 permits in the window (200 firms times 12 days).

If training took place at the gate, 900 hours would fall on the start days, when crews would be waiting for admission. Training before arrival moves that time outside the plant and outside the crews' working hours on the installation. The plant also gets a ready record of who is trained before anyone stands at the gate.

For comparison with the scale from the cards: one installation with about 20 firms is launched in about 6 weeks, and implementing training and permits fits in a single price in the range of roughly a dozen thousand zloty net (indicative ranges from 2025–2026 implementations; individual quotation). With 200 firms, the scope of configuration, the number of accounts and the timelines are set individually.

Induction training hours on the first day of the turnaround

Induction training hours on the first day of the turnaroundBar chart: 900 training hours on the start day with training at the gate versus 0 hours with training before arrival.02004006008001000hoursTraining at the gate: 900 hours900 hoursTraining at the gateTraining before arrival: 0 hours0 hoursTraining before arrival
Source: Illustrative calculation: 1,200 people x 45 minutes

Effect: what changes in the work of the departments

For the turnaround coordinator the effect is a current picture of open jobs instead of binders. For approvers: an enforced sequence of steps for particularly hazardous work, so safeguards and measurements do not depend on memory and discipline. For the health and safety department: a complete path of training, qualifications, permit and inspection recorded as evidence.

Employees of external firms are not counted as licence users and generate no licence costs regardless of the number of people trained, so the jump from 20 to 200 firms does not change the number of paid accounts on the plant side. This offer deliberately excludes locating people: no beacons, wristbands or position tracking.

Conclusions for Seveso group plants

First, training before arrival is the cheapest way to avoid a queue at the gate. Second, the register with expiry dates must be closed earlier than the job list, because it decides who can receive a permit at all. Third, the sequence of steps for particularly hazardous work is worth enforcing in the system and not in an instruction.

The system supports meeting internal procedure requirements and provides evidence for an audit, but it does not replace the decisions of responsible persons or the reviews required by regulations.

Example calculation

Firms, people and training hours during the turnaround

Assumptions
ParameterValue
External firms200 firms
People per firm6 people
Online training45 minutes per person
Turnaround window12 working days
Permits per firm1 per day

Result: 200 x 6 = 1,200 people; 1,200 x 0.75 h = 900 h of training; 200 x 12 = 2,400 permits in the window

Note: Illustrative calculation based on the assumptions above, without data from a specific plant.

Video

Frequently asked questions

Is 200 firms implementation data?

No. The data from the cards concerns a plant with about 20 firms. The number 200 is a scenario assumption, and the calculation of hours and permits is an illustrative calculation.

Do employees of external firms generate a licence cost?

No. Employees of external firms and guests are not counted as users, and the training module has a fixed rate regardless of the number of people trained.

Does the system locate people on the plant site?

Not in the described offer: there are no beacons, wristbands or position tracking. Inspection is done with a QR code.

In which languages does the training work?

In the described case the training and the declaration are in two language versions. The platform interface and documents work in six languages.

Sources

Train contractors before they reach the turnaround