InnerWeb
Skip to main content

Security checklist: phone failure at the gate

When a phone scan fails, the guard has a few seconds before a queue forms behind the gate. This checklist orders the steps from the quickest to the longest: screen, code, rescan, label printout, identity confirmation and logging the event.

5 s
window protecting against a double entry event
Source: feature card: Security Guard Panel & QR Gate Control
12 h
after this time automatic checkout every 3 hours
Source: feature card: Security Guard Panel & QR Gate Control

How to use the list during the shift

Print the list and place it at the guard's station. Each step has a limited time, so the guard does not get stuck on one problem. When a step resolves the matter, the guard skips the remaining ones and makes the log entry at the end.

The checklist covers the gate and the training tablet. With a tablet the situation is similar: a scan does not log the person in by itself, and the system shows the first name, last name and company with the question 'Is it you?'. So if that screen does not appear, the problem is with reading, not with the account.

Step 1: screen and reading

The most common cause is simple: the screen is dimmed, scratched, or a film covers the code. Ask for full brightness and for the screen to be wiped. The security panel reads the code from a HID scanner, a USB-COM scanner through the browser, and from a camera, so when one method fails, try the other.

When rescanning, remember the 5-second window: a repeated scan of the same person within 5 seconds does not create a new entry event. This is not an error, but protection against duplicate entries.

Recommended time limit per step (seconds)

Recommended time limit per step (seconds)Horizontal bar chart: recommended time limits for the five steps of the guard procedure0204060sScreen and readingScreen and reading: 15 s15Code and messageCode and message: 20 s20Label printingLabel printing: 60 s60Identity confirmationIdentity confirmation: 10 s10Log entryLog entry: 30 s30
Source: Author's recommendation to be fitted during the pilot, not a measurement result

Step 2: code and message

If the screen is clean and the scan still fails, ask the person to open the message with the QR code and show it again. The message contains a code of 233 x 233 pixels with a link to the plant. Sometimes enlarging the image helps, and sometimes moving the phone closer to or further from the scanner does.

If there is no message, the guard checks in the panel whether the person is registered. The message is sent only after the required training has been passed, so a missing code may mean that the training has not been completed.

Step 3: printing a label

If the phone continues to fail, the guard prints a label with the QR code for that person. The default label size is 86 x 54 mm, and the code is not printed smaller than 13 mm. The label carries no personal data, because the code contains a random token, which is printed only on the physical label and is not returned in the responses of the security panel interface.

A guest registered at reception receives a label in one action with the registration, so for guests this step is usually the quickest.

Step 4: identity confirmation

When the scan succeeds, the system shows the first name, last name and company of the code owner. The guard compares them with the person at the gate, not with a number. If the details do not match, the code does not belong to this person, and security moves to clarification rather than opening the passage.

If there are doubts about a phone that may have been lost or borrowed, the guard reports the matter for revoking the code: the system issues a new code and the old one stops working.

Step 5: log entry and closing

Every failure ends with an entry: date, time, gate, cause (screen, film, code, message, browser) and the solution applied. After a month, the collected entries show which cause to remove first.

People who have been on site for more than 12 hours are automatically checked out every 3 hours, and these entries are marked as closed automatically. The guard does not need to close entries manually after a failure if the person has left and was not tapped out.

Checklist

Video

Frequently asked questions

What to do when the scan works but the details do not match the person?

Do not open the passage and move to clarification. The code belongs to another person, so security reports the matter and, if needed, revokes the code.

Does a failure of the training tablet require different steps?

Basically no. First the screen and the code, then a label or a manual choice of the account after identity confirmation. A scan does not log the person in by itself, and training starts after confirmation.

How quickly does an employee get a new code after losing the phone?

It depends on the duty arrangements and the sending channel. Meanwhile security prints a label, and the new code arrives by e-mail or by SMS with a link.

Let us fit the list to your gate

We will prepare a print-ready version for the guard's station and rehearse it with security on an example plant.

Let's talk