What a good first week looks like
A good first week is not one without errors, but one in which every error was noticed and described. The pilot is meant to provide data for the rollout decision, so the coordinator collects three kinds of information every day: how code reads perform, what state the tags are in and what the delivery routes look like.
It is worth agreeing with the security and logistics teams on one fixed place to record remarks, for example a shared spreadsheet, and on one hour of daily review. Without a rhythm, a pilot turns into a series of isolated complaints.
Appointment code read telemetry
Every read of an appointment card code is recorded in telemetry: the code entered, the query code, the result, the transport status, response time, source and operator. A failure to write telemetry does not interrupt security's work, so a missing telemetry entry does not mean the gate has stopped.
Check each day how many codes returned data and how many returned an empty result. The query is sent once, in the canonical 5-character code, and codes with leading zeros are normalised to one form, so differences in how a code is written should not produce empty results.
Remember that a delivery completed in the appointment system is deliberately treated as missing data. An empty result for a code from an old card is intended behaviour, not a fault.
Parameters monitored during the pilot
Tag service
The tag service tab is diagnostics only, for reading. A tag that is offline or has a battery at or below 5 percent gets a recommendation to recharge and switch on, while the others show battery state, charging, gate or location, and the number of the active delivery.
The task for every morning: open the tab, note how many tags are offline and how many have low battery, and hand the list to the person responsible for charging. Because the tab only shows the state, a person carries out the repair.
Delivery routes and beacons
The delivery route view shows the tag's path from entry to the present moment and marks stops longer than one minute. The route is based on BLE beacons, not GPS. In the pilot it is the best test of beacon placement: a gap in the route marks a place where coverage is too sparse.
Plant roads need a beacon roughly every 100 m, and indoors one beacon covers 100-200 m2. The position is averaged from the signals of several beacons on the map. If routes show jumps, note the place and compare it with the beacon layout plan.
On the online map the colour shows the level of supervision: red for navigation for a foreign driver, black for delivery under special supervision, white for an ordinary one. Check whether the markings on the map match security's decisions.
Checklist
Video
Frequently asked questions
Does the tag service tab repair devices?
No. It is diagnostics for reading. It recommends recharging and switching on, and a person carries it out.
Does a telemetry error stop the gate?
No. A telemetry write error does not interrupt security's work.
How do you know there are too few beacons?
From gaps and jumps on delivery routes. Plant roads need a beacon roughly every 100 m.
Let's plan the pilot on your yard
Book a call. We will agree the pilot scope, the placement of beacons on access roads and the rhythm of the daily review.
Let's talk