InnerWeb
Skip to main content

Driver locator pool at the peak of deliveries

At 6:00 AM fourteen trucks stand at the gate, and there are three charged locators in the charger. The best practices below help the security shift supervisor keep the pool ready: who charges, what to check in the locator service and how to mark drivers who need special attention.

5%
battery threshold at which a locator gets a charging recommendation
Source: card
10
languages of voice messages
Source: card

Why a driver locator and what security does with it

A BLE locator issued to the driver at the gate lets the plant see the vehicle on the map, follow the route trace and play voice messages. The position comes from averaging the signals of many transmitters, not from GPS, so it also works between buildings and under a roof.

For the security shift supervisor the locator is also equipment to manage: it has to be issued, collected, charged and checked. At the delivery peak, when a dozen or so vehicles arrive in a short time, what counts is not the number of locators in the magazine, but the number that are charged and ready.

Practice 1: the service tab as a daily check

The locator service tab is read-only diagnostics. A locator that is offline or has a battery of 5 percent or less gets a recommendation to charge and switch on, while the others show the battery state, charging, the gate or place and the number of the active delivery.

We recommend looking there at the start of each shift and before the expected peak. The check takes a few minutes and answers the question of how many locators can be issued on the spot.

Sample balance of the locator pool at the peak

Sample balance of the locator pool at the peakBars: 14 vehicles at the peak, 16 charged locators, a reserve of 2 pieces.05101520pcsVehicles at the peak: 14 pcs14 pcsVehicles at the peakCharged locators: 16 pcs16 pcsCharged locatorsReserve: 2 pcs2 pcsReserve
Source: Illustrative calculation: assumption of 14 vehicles in the peak hour and a pool of 16 ready locators

Practice 2: a reserve for the peak, not for the average

The pool is set by the peak, not by the daily average. If the largest number of trucks arrives within one hour, the reserve should cover that hour plus the charging time of the returned locators. We recommend writing one number into the shift supervisor's instructions: the minimum number of charged locators before the peak starts.

Charging is done with a multi-charger, which is equipment bought and integrated with the system, not an InnerWeb product. Its capacity has to match the pool: a charger for ten places will not serve a peak of twenty vehicles.

Practice 3: delivery colours on the online map

On the online map a vehicle with navigation for a foreign driver is red, a delivery under special supervision is black, and an ordinary one is white. The colour comes from the choice saved with the locator, so security decides on it at the moment of issue.

We recommend setting an internal rule: who is marked as a driver under special supervision, for example for a delivery of sensitive materials or a vehicle that is to drive into a zone with restricted access. A rule written on paper ends disputes about who decided.

Practice 4: voice messages for drivers from abroad

A driver with a BLE locator can receive voice messages at the plant's junctions in one of 10 languages. What to say at which junction for which warehouse is set by the administrator in an editable matrix, without live routing.

We recommend checking the matrix after every change in traffic organisation on the yard: a new dock, a closed crossing, a renovation. An outdated message serves the driver worse than no message, because it leads them to the wrong place.

Practice 5: the route trace after an incident

The delivery route view shows the locator's route from entry to the present moment and marks stops longer than one minute. The route comes from BLE transmitters, not from GPS. After an incident, for example when a vehicle stopped in the wrong place, the shift supervisor can reconstruct what happened.

We recommend using this trace in a talk with the carrier: a stop longer than a minute in a zone where the vehicle should not be is more convincing than the guard's account.

Checklist

Video

Frequently asked questions

Does the locator service tab change anything?

No. It is read-only diagnostics: it shows the battery, charging, the gate or place and the number of the active delivery.

Does a locator require GPS?

No. The route and position come from the signals of BLE transmitters on the plant map.

Who sets what the message at a junction says?

The administrator, in an editable matrix. It is a message matched to the point, not live navigation.

Sources

Prepare the gate for the delivery peak

Let us talk about the locator pool and charging in your delivery rhythm. We will size the pool to the peak, not to the average.

Let's talk