IT department: address, firewall and camera
The IT department is responsible for the phone opening the system at all after the badge is scanned. A phone that scans the code with its camera opens the address with the badge token without installing any app, so the whole preparation comes down to the address and the network.
The QR scanner in the browser requires a secure HTTPS context. An installation served over plain HTTP under an IP address will not start the camera. Check the address from a phone connected to the plant network, and from a phone on mobile data if workers are to use the system outside the hall.
- HTTPS address with a valid certificate
- firewall does not block the system address or the scanner library served from the system's own server
- camera test: four messages (no permission, no camera, insecure context, no support)
HR department: badges, roles and invitations
HR prepares badges with QR codes for the pilot group. The same code serves four purposes: gate control, an e-mail invitation, control in the hall and login to training on a tablet, so separate carriers do not need to be printed.
Decide who enters by which route. Only people in transitional roles may take the induction training on a tablet by themselves: supplier, courier and visitor. Plant employees and external contractors enter through an invitation or the registration module. The pilot group should cover both routes.
Control points by department
Safety team: materials in the workforce's languages
The safety team checks in which languages the pilot participants will work. The interface has six languages (Polish, English, German, Finnish, Russian, Swedish), and kiosk training four (Polish, English, Ukrainian, Russian). Availability of training depends on the plant's materials, so the materials must be ready before the start.
When material in a person's language is missing, the gate requires training in Polish instead of skipping it. Appoint a supervisor for such cases and record how many people lacked material: this is the data for the decision to add a language version.
Reference from a packaging plant
In a plant producing corrugated cardboard packaging, guests register with a phone, the health declaration at the entrance (a BRCGS requirement), the video safety induction in language versions and for groups, and the QR labels are part of one flow. The pilot is worth building on the same pattern: one flow instead of several separate tools.
For your own plant this means setting the order: registration, declaration, training in the person's language, QR label. The test pilot goes through the whole sequence on the phone of one person from each language group.
Feedback channel and pilot measurement
For external companies the first item in the side menu is the link Write to us with remarks and reports. The message subject has a fixed prefix, and the content includes the screen, the device and the time of the click. In the pilot this is the basic channel, because it allows a report to be reproduced without asking follow-up questions.
Measure three things: the share of scans finished with a confirmation, the number of camera messages, and the number of people who lacked material in their language. On this basis the plant decides whether to extend the pilot, and in what order to add language versions.
Checklist
Video
Frequently asked questions
How many people should the phone pilot cover?
The plant sets the number, but the group should cover every entry role and every language of the workforce. A small group with the full range is better than a large uniform one.
Do workers have to install an app?
No. The phone opens the system in the browser after the code is scanned with the camera, and the badge token goes to the training screen as an input parameter.
What should be measured in the first weeks?
The share of scans finished with a confirmation, the number of camera messages and the number of people without material in their language. These three numbers show what to fix before extending the pilot.
Plan the pilot on your workforce's phones
Book a call: we will set the pilot group, the HTTPS address, the badges and the materials languages, and the way results are measured.
Let's talk