InnerWeb
Skip to main content

Gate scanner checklist before the first shift

After installing or replacing hardware, the implementer has a few minutes before the porter takes over the desk. This gate scanner checklist organises those 13 minutes: the interface, address reading, keyboard layout, browser, ports and a scan test in the panel.

13 min
time budget for the station test before the first shift
Source: zalozenie checklisty

Minutes 0-3: interface and power

Start by checking the scanner interface: USB keyboard (HID) or serial port (USB-COM). On many scanners, changing the interface restores default symbol settings, so each change means repeating the later steps.

If you program the scanner with configuration codes, the USB cable must stay connected for the entire sequence. Loss of power during programming discards the settings being changed and the scanner returns to its previous state, and the technician does not see it until a test code is scanned.

Minutes 3-6: address reading and keyboard layout

On scanners from some manufacturers, reading of QR codes containing a web address is disabled by default. The scanner signals a read but sends nothing to the computer. Enable this symbol type and scan the test badge.

Set the keyboard country code to match the system. A scanner on a layout different from the computer's, for example French AZERTY, or working with Caps Lock on, garbles the address characters. The panel's parser then tries a second time with a reversed mapping, but the source setting should be fixed permanently.

Breakdown of the 13-minute test

Breakdown of the 13-minute testHorizontal bar chart: interface 3 minutes, addresses 3 minutes, browser 3 minutes, panel test 4 minutes.01234minInterface and powerInterface and power: 3 min3Addresses and keyboardAddresses and keyboard: 3 min3Browser and portsBrowser and ports: 3 min3Test in the panelTest in the panel: 4 min4
Source: Time split proposed in the checklist; 13 minutes in total

Minutes 6-9: browser and ports

A scanner in USB-COM mode works through Web Serial, so the station must have Chrome or Edge. Check that the browser has permission to access the port and that the panel window is active.

In this mode the scanner may appear as two ports of the same device. The panel opens all ports of the device and removes duplicates within a 2584 ms window, so you do not need to disable either of them by hand. Check that one scan gives one entry.

Minutes 9-13: test in the panel

Scan a badge with a green verdict. The first scan records entry, the second exit. Then scan the badge of a person without the required training and check that the panel shows a red verdict and records a refusal.

Scan the same code twice within 5 seconds. The server should ignore the second scan, with no new entry and an informational message about a duplicate scan. If a second entry appears, the problem lies in the scanner configuration or port duplication, not in the person scanning.

After the test: what to leave at the desk

Leave a short card at the station with the scanner mode, the browser and the keyboard country code. When something starts to fail after a hardware change, this card shortens the diagnosis from an hour to a few minutes.

Also record the date of the test and the result of the three scans: green, red and double. This is sufficient evidence that the station was checked before the first shift.

Checklist

Video

Frequently asked questions

Is the test after replacing a scanner really needed?

Yes. On many scanners a change of interface restores default symbol settings, so address reading must be checked again.

The scanner beeps but the panel shows nothing. What should I check?

First enable reading of QR codes with a web address, then the keyboard country code and the focus of the panel window.

Do I have to disable the two scanner ports?

No. The panel opens all device ports and removes duplicates within 2584 ms.

Start the station without surprises

We will go through the checklist with you on your hardware and browser, before the porter scans the first code.

Let's talk