InnerWeb
Skip to main content

Checklist for commissioning the next site on a shared platform

Each further site on the shared platform is commissioned from the same list, so that after the tenth site no differences are left that nobody remembers. The system administrator ticks off in turn: the structure, the transmitters, the pulse period, SOS, the dialler and the acceptance. Below is the list with a comment on each step.

100-200 m2
of building area per transmitter
Source: karta
120 s
default pulse period, range 30-3600 s
Source: karta
3 s
SOS countdown during which it can be cancelled
Source: karta

Location structure of the new site

The structure has levels: plot, view (division), building, line and location. The view carries georeferencing, and buildings are areas inside it. The first step is to create a view for the new site and set its georeferencing, so that the map and the watch positions match.

Next, the administrator adds the buildings as areas inside the view and names them according to the scheme adopted across the network. A common naming scheme is a condition for readable reports for the whole platform.

Transmitters and their placement

Placement follows the rule: plant roads about every 100 m, and inside a building one transmitter per 100-200 m2. The position is calculated from the signals of several transmitters averaged on the map, without GPS. The administrator enters the transmitters into the structure of the site according to the placement plan.

For the preliminary number of transmitters, use the proportion from the offer: 100 units cover typically about 20,000 m2, that is on average one transmitter per 200 m2. For a building of 5,000 m2, the 100-200 m2 rule gives between 25 and 50 units, and the final number is set by the plan based on the geometry.

Transmitters for a 5,000 m2 building under the placement rule

Transmitters for a 5,000 m2 building under the placement ruleBar chart: a 5,000 m2 building needs from 25 transmitters at one per 200 m2 up to 50 at one per 100 m2.01020304050transmitters1 per 200 m2: 25 transmitters251 per 200 m21 per 100 m2: 50 transmitters501 per 100 m2
Source: Sample calculation: 5,000 m2 divided by 200 and by 100 m2 per transmitter

Pulse period, SOS and inactivity alarm

The pulse period of the watches is set in the panel: the default is 120 s, within the range 30-3600 s. The value reaches the devices in response to the next pulse, without reflashing the fleet. For a new site the administrator takes over the value from the network template and changes it only where the nature of the work requires it.

SOS on the watch starts with a triple press or a hold of the button, with a 3-second countdown during which it can be cancelled. The administrator checks that the SOS alarm appears on this site's map and reaches the right supervisors. In a live production deployment the inactivity alarm warns after 20 s without movement, and after a further 30 s it raises the alarm; the thresholds are recorded in the site configuration.

Dialler and list of people

The automatic dialler calls the assigned people and repeats until there is an answer. For this reason, an up-to-date list of people and the calling order must be recorded for each site. The list for a new site should not be a copy of the list from another one, because shifts and duties differ.

Acceptance of the site and record for audit

Acceptance completes the commissioning. The administrator makes a test pulse from the watch, confirms the position on the map, checks SOS in the agreed rehearsal and signs the acceptance protocol. The documentation keeps the structure of the site, the transmitter plan, the configuration and the protocol.

The duty to ensure safe working conditions arises from art. 207 of the Polish Labour Code (Kodeks pracy). The system provides evidence for an audit, not a guarantee of compliance, so the acceptance protocol describes the state of the site on the day of commissioning and supports later reviews.

Checklist

Video

Frequently asked questions

Does each site require a separate configuration?

Yes. All sites run on the shared platform, but the configuration of each site is separate. Common settings are best kept in the network template.

How many transmitters go into a building?

In a building one transmitter per 100-200 m2, and on plant roads about every 100 m. The final number is set by the plan based on the geometry.

Does changing the pulse period require a visit to the watches?

No. The period is set in the panel and reaches the devices in response to the next pulse, without reflashing the fleet.

We will prepare the checklist for your network

Book a call with the system administrator. We will match the commissioning list to your sites and configuration template.

Let's talk