How does an employee raise SOS on the watch?
SOS starts with one of two gestures: a triple press of the button or holding it down. Both work even when the watch face is on screen, so the employee does not have to open a menu or look for an app first. This matters in training: the instructor teaches one reflex, not a procedure with several steps.
After the gesture the watch does not send the alarm straight away. A 3-second countdown starts, giving the employee time to step back. Only when it ends does SOS reach the system. In training it is worth practising both gestures with the countdown on your own watch, so everyone sees what the screen looks like during those three seconds.
What about an accidental press, and how is SOS cancelled?
The countdown exists so that a false alarm does not reach the dispatcher. If the employee presses the button by mistake, they cancel SOS during those 3 seconds and nothing is sent to the system. No permit is created, there is no notification and no entry on the map.
Once the countdown has run out, cancellation is no longer possible on the watch. The alarm is then live and a person on the dispatcher or supervisor side handles it. The instructor should say this openly: three seconds is the window for a mistake, and after it the alarm is real, even if the employee changes their mind.
Time scale: SOS countdown and inactivity thresholds
What happens after SOS is sent?
SOS is an active and unconditional signal. Once it is sent, the system opens its own SOS permit, alerts supervisors with a notification and shows the event on the online map. The supervisor therefore sees both that someone has called for help and the place where this watch last reported its pulse.
Unconditional means that no setting pauses this alarm. It does not depend on inactivity thresholds or on whether the employee moves after sending the signal. For training the rule is simple: pressed, counted down, the alarm is with the supervisor.
- a separate SOS permit opens, shown next to the other permits
- supervisors receive a notification
- the event appears on the online map with the last known position
Who closes an SOS alarm, and how does it differ from inactivity?
A person closes the SOS alarm. Movement by the employee does not clear it: even if the person walks around the site, the alarm stays open until an authorised person closes it. This is the opposite of the inactivity alarm, which the server infers from pulses and which closes by itself once movement returns.
That is why the procedure records two separate scenarios. In inactivity the system watches for lack of movement itself and closes the alarm itself when movement returns. In SOS the system guesses nothing: the signal comes from the employee, and the closure comes from the person who confirmed that help has arrived. SOS also has no link to inactivity settings, so changing the inactivity thresholds does not affect it.
Example of inactivity thresholds in a live production deployment
In a live production deployment the inactivity alarm warns after 20 s without movement, and after a further 30 s without a response it raises the alarm. The chart below puts these values next to the 3-second SOS countdown to show the time scale of both mechanisms.
How does SOS reach the system when the watch has no Wi-Fi?
The LoRa watch does not connect to Wi-Fi. Its radio frames are received by a gateway, which translates them into the existing HTTP contract of the backend, so for the SOS platform a watch alarm looks like any other event. Between pulses the watch stays in deep sleep, which is why it runs for days rather than hours.
If the watch cannot hear any transmitter, it still sends the frame, and the backend fills in the last known location. In practice an SOS from outside transmitter range still reaches the dispatcher, with the position from before the signal was lost. In the variant with a repeater, the watch transmits to an intermediate gateway, which forwards the frame onward, and SOS remains deterministic.
How to prepare SOS training for the crew?
Good training is short and ends with a practice run. The instructor shows both gestures, the countdown, the cancellation and what the supervisor will see. Then each participant makes their own press, cancels it during the countdown, and once makes it go through, agreed in advance with the dispatcher, so the employee knows how the watch behaves in both cases.
Add one sentence on responsibility to the training material: a person closes the alarm, so the dispatcher must know who owns the closure in each shift. This sentence resolves the most common dispute in the first weeks of running the system.
Checklist
Video
Frequently asked questions
Can SOS be raised from the watch face?
Yes. A triple press or a hold of the button also works from the watch face, so the employee does not have to open a menu. After the gesture a 3-second countdown starts, during which it can be cancelled.
Does employee movement clear an SOS alarm?
No. SOS is an active and unconditional signal, so movement does not close it. A person closes it after confirming that help has arrived.
Does SOS depend on inactivity settings?
No. SOS has no automatic closure and no link to inactivity thresholds. Inactivity is a separate mechanism that the server infers from pulses.
What does the supervisor see after an SOS is sent?
They receive a notification, and the event appears on the online map. The system also opens a separate SOS permit that documents the event for later analysis.
We will practise SOS with your crew
Book a call about training on the SOS button. We will show the countdown, the cancellation and the view your supervisor gets on your map.
Let's talk