InnerWeb
Skip to main content

Checklist before a visit to an unattended site

A technician travelling alone to a site with no staff has no one to call for help, so everything that is meant to protect them has to be checked before departure. On the day of travel, the service coordinator goes through five areas: the watch, the permit, the route with checkpoints, the dispatcher's number and communications. Below is the checklist with a comment on each point.

20 s + 30 s
inactivity warning and alarm in a live deployment
Source: karta
120 s
default watch pulse period
Source: karta
30
pulses per hour at a 120 s period (sample calculation)
Source: kalkulacja przykladowa

Watch: working, charged and assigned

Between pulses the LoRa watch stays in deep sleep, so it runs for days rather than hours. Even so, on the day of travel the coordinator checks the battery level, because the device sends it with every pulse and it is visible in the panel. A watch that leaves with an unknown battery level is the first cause of false worry on the dispatcher's side.

Also check that the watch is assigned to the right person. The position from the pulse is used for the view of who is on site, so a watch assigned to someone else will show the wrong person on the map. Make a test pulse before departure and confirm in the panel that it arrives.

Work permit and its automatic attachment

The position from the pulse allows the employee to be attached to a work permit automatically and removed from it after leaving the site. The coordinator therefore checks whether a work permit for the site is issued and covers the right scope and location, before the technician arrives.

If the permit does not exist or covers another area, the automatic attachment will not work as expected. Issue the permit before departure, and after arrival check in the panel that the technician has been attached.

Pulses per hour depending on the pulse period

Pulses per hour depending on the pulse periodBar chart: a 30 s pulse period gives 120 pulses per hour, the default 120 s gives 30, and a 3600 s period gives 1.0255075100125pulses per hour30 s period: 120 pulses per hour12030 s period120 s period (default): 30 pulses per hour30120 s period (default)3600 s period: 1 pulses per hour13600 s period
Source: Sample calculation: 3600 s divided by the pulse period within the range 30-3600 s

Route with checkpoints and round checklists

The Patrols module lets you define checkpoints on the map with their own checklists, and group them into routes per division. Each checkpoint is confirmed during the round. Before departure the coordinator checks that the route for this site exists, covers the right checkpoints and has up-to-date checklists.

For an unattended site the route has an additional function: it shows the dispatcher where the technician is and what they have already done. The absence of confirmation of the next checkpoint within a reasonable time is a signal to make contact, before the inactivity alarm triggers.

Dispatcher's number and the alarm path

The technician knows the dispatcher's number and who is on duty that day. In a live production deployment the inactivity alarm warns after 20 s without movement, and after a further 30 s without a response it raises the alarm. An automatic dialler calls the assigned people and repeats until there is an answer, so the list of people to call must be up to date on the day of travel.

The coordinator confirms three things with the dispatcher: that they know about the trip, that they can see the technician on the map, and that the list of people for the alarm matches the current shift.

Communications: gateway, range and last known location

The LoRa watch does not connect to Wi-Fi: its frames are received by a gateway, which forwards them to the backend. Before departure the coordinator checks that the gateway on site receives frames, which is confirmed by a test pulse. With a 120 s pulse period the watch sends 30 pulses per hour, so the absence of pulses in the panel for a few minutes is a signal to check, not to wait.

When a node cannot hear any transmitter, it still sends the frame, and the backend fills in the last known location. Battery, status and inactivity therefore also work outside transmitter range, although the position then comes from before the signal was lost. The technician should know this so as not to assume the map always shows the current location.

Checklist

Video

Frequently asked questions

Does the watch need charging every day?

Between pulses the watch stays in deep sleep and runs for days. Even so, the battery level is checked on the day of travel, because it is visible in the panel.

What will the dispatcher see when the technician is outside transmitter range?

They will see the last known location, as well as the battery, the status and any inactivity, because the frame is also sent without audible transmitters.

Who is called when the technician does not respond?

After 20 s without movement there is a warning, and after a further 30 s without a response an alarm. The dialler calls the assigned people and repeats until there is an answer.

We will build the checklist for your sites

Book a call with the service coordinator. We will prepare a checklist for unattended sites on your routes and watches.

Let's talk