InnerWeb
Skip to main content

Delegation visit to the plant: a checklist for the day before arrival

A delegation visit to the plant requires that the gate stops nobody and that the host knows whom they receive. The checklist for the secretariat and security covers the visit in the system, the host, the training in the guests' languages and the validity of the activation links.

377 days
maximum lead time for scheduling a visit
Source: system feature
7 days
validity of the activation link
Source: system feature

Why we check the day before

The day before arrival you can still fix what at the gate would require calling the manager: a missing visit, a host without a phone number, or inactive training in the guests' language. On the morning of the visit only time for exceptions remains.

The list below is divided into tasks for the secretariat and for security. The first part concerns what has to be scheduled in the system, the second what security needs to know about the gate.

Secretariat: the visit, the host, the dates

A visit can be scheduled for any days from today, up to 377 days ahead and up to 34 days at once. A day on which the person already has a visit is skipped. For a multi-day delegation one scheduling is enough, but on the day before arrival it is worth checking that entries exist for all the days.

Every visit has a host, meaning an active internal employee. The host should have a phone number in their profile, because at the first entry of the guest the dispatcher calls them once. Without a number the host receives only an email asking them to complete the profile, so they would learn about the call too late.

Limits relevant before a delegation arrives

Limits relevant before a delegation arrivesHorizontal bar chart: 377 days ahead, 34 days at once, link valid for 7 days, group window of 3 minutes.0100200300400countDays aheadDays ahead: 377 count377Days at onceDays at once: 34 count34Days the link is validDays the link is valid: 7 count7Group window (min)Group window (min): 3 count3
Source: Documentation of the visits and invitations feature

Security: the gate and the training

A visit removes only the requirement for a work permit. Training, qualifications and an active account still decide on admission, so security should know who from the delegation has the training and who will complete it at the kiosk. When there is no active introductory training in the language of the account, the person goes straight to setting a password, so the set of training in the guests' languages has to be checked before the invitation.

If the guests received invitations, the activation link is valid for 7 days. For a visit scheduled more than a week in advance the link may expire before arrival. An expired link does not end with an error, only with a redirect to login and the option to request a new link.

On the morning of the visit

Security at the gate sees a refusal with its reason and can schedule a visit from the refusal card, always for today. This is an emergency path, not the basic plan. If the delegation arrives as a large group, further guests of the same host within 3 minutes are collected into one group call sent after 30 seconds of silence.

After the visit check that badges have been returned and the visits closed. The record is evidence for an audit and helps when settling the stay.

Checklist

Video

Frequently asked questions

Does a multi-day delegation need a separate entry for each day?

No. The visit can be scheduled for several days at once, up to 34 days, and a day with an existing visit is skipped.

What if the host has no phone number?

The host receives one email asking them to complete the profile, but will not receive the call from the gate. The number has to be added before arrival.

Does a visit replace training?

No. It removes only the work permit requirement; training and the active account still decide on entry.

Prepare the gate for a delegation

We will help you set up visits and training before an important arrival. Book a conversation with the InnerWeb team.

Let's talk