The problem: a series of calls on the day of the visit
At the first entry of a guest on the day of the visit, the dispatcher automatically calls the host once, with no retries. For a single person this is a good solution. For a group of fifteen people who scan their codes one after another, a series of calls would follow, which the host cannot answer because he is leading the guests.
The solution is built in: further guests of the same host within 3 minutes are gathered into one group call, sent after 30 seconds of quiet. Three minutes without movement reset the window, so after a longer pause the next guest starts a new call.
How it works in practice
The window is counted from the first entry. As long as further people of the same host appear within the next seconds, the system waits. When 30 seconds of quiet pass, it sends one call with information about the whole group. The call states the guest, the company, the entry point and the purpose of the visit.
- The first entry opens the collection window.
- Further guests of the same host within 3 minutes join the group.
- After 30 seconds of quiet, one group call goes out.
- After 3 minutes without movement, the window is reset.
Calls to the host for a group of 15 people
Good practice for receiving a group
The group window solves the problem of calls, but it does not replace preparation. The four practices below concern what to do before the day of the visit and during it, so that the group enters smoothly and the host can focus on the guests rather than the phone.
Plan the visit in advance
A visit can be planned for any day from today, up to 377 days ahead and up to 34 days at once. For a group arriving on a known date, it is worth preparing the visits a week ahead, rather than at the gate on the day of arrival.
One host for the group
The group call works for guests of the same host. If a delegation of five people is assigned to five different hosts, five calls will be made. Name one host for the whole group.
Prepare the introductory training for the group
A supplier, a courier or a guest can complete the introductory training on a tablet by themselves: the kiosk recognises a trained person and welcomes them, while an untrained person is shown the training. For a group this means a queue at the kiosk, so set up several devices or spread the arrival over several minutes.
Tell the host that the call will be one
A host who does not know the mechanism treats the group call as the first of many and waits for the next ones. One sentence at the briefing before the visit is enough.
Illustrative calculation: 15 people, one host
Assuming that a group of fifteen people enters within two minutes and the host is the same, without a group window there would be 15 calls, and with the window there is one. This is an illustrative calculation based on our own assumptions. With a call lasting about 30 seconds, the host gains more than seven minutes that he can devote to the group.
What happens after the call also matters. A host who knows from one call that a group has arrived can go out to one entry point, instead of looking for individual people at the gate. It works well to set up a meeting point just beyond the gate and a short briefing: who leads, which way we walk, where the assembly point is in case of an alarm.
It is also worth splitting the group if it is very large. Forty people entering at once will overload the kiosks and reception regardless of the call window. Dividing them into two or three groups a few minutes apart, with separate hosts, shortens the queue, and each host receives their own single group call.
After the visit, check the register: who entered, at what time, and to which host. Such a summary is useful for future group visits and for audits, and preparing it requires no additional work from the guard.
Checklist
Video
Frequently asked questions
After how long does the group call go out?
After 30 seconds of quiet, that is when no further guest of this host has entered during that time.
What if guests arrive at intervals longer than 3 minutes?
Three minutes without movement reset the window, so the next guest starts a new call.
Will a group from several companies get one call?
Yes, if the guests have the same host and enter within the time window. The host counts, not the company.
Let's prepare the reception of a group at your plant
At the demonstration we will show the group window and the introductory training on several tablets.
Let's talk